Politique énergétique aux Pays-Bas

Répondre


Cette question vous permet de vous prémunir contre les soumissions automatisées et intensives effectuées par des robots malveillants.
Émoticônes
:D :geek: :ugeek: :ghost: :wtf: :-D :) :-) :-( :-o :shock: :? 8-) :lol: :-x :-P :oops: :cry: :evil: :twisted: :roll: ;) ;-) :!: :?: :idea: :arrow: :-| :mrgreen: =D> #-o =P~ :^o [-X [-o< 8-[ [-( :-k ](*,) :-" O:) =; :-& :-({|= :-$ :-s \:D/ :-#
Plus d’émoticônes

Le BBCode est activé
La balise [img] est activée
La balise [flash] est activée
La balise [url] est activée
Les émoticônes sont activées

Relecture du sujet
   

Agrandir Relecture du sujet : Politique énergétique aux Pays-Bas

Re: Politique énergétique aux Pays-Bas

par energy_isere » 18 sept. 2024, 00:21

Les Pays-Bas prêtent 19 milliards supplémentaires à l'opérateur Tennet

AFP le 17 sept. 2024

Le gouvernement néerlandais a annoncé mardi un prêt de 19 milliards supplémentaires au gestionnaire de réseaux électriques public TenneT pour 2025 et 2026, afin de garantir à l'entreprise les investissements nécessaires à son expansion.

Un projet de rachat par Berlin de la filiale allemande de l'opérateur a échoué en juin en raison de contraintes budgétaires.

Le gouvernement néerlandais "a l'intention de continuer à s'occuper lui-même du financement de TenneT Pays-Bas", a-t-il déclaré dans un communiqué.

"En principe, le gouvernement ne veut pas utiliser l'argent des contribuables néerlandais pour la partie allemande", a-t-il souligné.

Une décision sur la forme de l'entreprise doit être prise au printemps 2025.

Afin de "combler le délai jusqu'à la mise en oeuvre de solutions structurelles", l'Etat néerlandais a accordé à TenneT un prêt supplémentaire de deux milliards d'euros pour 2025 et de 17 milliards d'euros pour 2026.

"Ce prêt est nécessaire pour donner à TenneT et au marché la certitude de poursuivre les investissements nécessaires dans le réseau électrique, afin que les plans puissent être mis en oeuvre au cours des deux prochaines années".

"Cette certitude est également importante pour réussir la transition" énergétique, selon le gouvernement néerlandais, qui avait déjà accordé un prêt de 25 milliards d'euros à TenneT pour les années 2024 et 2025.

Le projet de rachat par Berlin de la filiale allemande du gestionnaire de réseaux électriques semblait conclu à l'automne 2023, avant qu'un arrêt choc de la Cour constitutionnelle fédérale, laissant un trou de 60 milliards d'euros, ne provoque une crise budgétaire sans précédent en Allemagne.

"La participation d'investisseurs privés dans TenneT Allemagne est actuellement considérée comme la meilleure solution structurelle pour répondre aux besoins en capitaux de TenneT Allemagne", a indiqué le gouvernement néerlandais.

Celle-ci pourrait se faire "par le biais d'une émission privée d'actions ou d'une introduction en bourse", a-t-il indiqué.

Des discussions à ce sujet sont prévues dans les mois à venir.
https://www.connaissancedesenergies.org ... net-240917

Re: Politique énergétique aux Pays-Bas

par energy_isere » 18 août 2024, 11:51

De plus en plus d'heures de prix de l'électricité négatif aux marché spot aux Pays Bas
Netherlands posts more negative energy prices
The Netherlands has recorded more hours of negative energy prices between Jan. 1 and Aug. 17 than it did in all of 2023. Dutch research firm Stratergy has noted a clear correlation between expected solar and wind energy and negative hourly prices in the day-ahead market.

August 16, 2024 Emiliano Bellini

The Netherlands' EPEX SPOT Day-ahead market registered 347 hours of negative prices between Jan. 1 and Aug. 14, according to figures from Dutch consultancy Stratergy. In 2023, the total number of hours of negative prices reached 316 for the full year.

“It is expected that this year, the total will fall between 450 and 550 hours, depending on the further development of gas prices,” analyst Jan Willem Zwang told pv magazine. “There is a clear correlation between the expected solar and wind energy for the following day and the negative hourly prices in the day-ahead market. Negative prices are most common during the day in the summer months, especially on weekends, holidays, and during vacation periods when expected consumption is lower. Additionally, it is evident that slightly stronger winds during the nights and colder months directly contribute to negative hourly prices.

Zwang said the growth in solar and wind capacity is expected to significantly increase the number of hours with negative prices in the coming years. He predicts a substantial rise in negative price hours as renewable energy capacity expands.

“In 2025, we will likely see between 550 and 750 hours,” he added, noting that these outcomes depend on the development of gas prices and the bidding strategies of renewable energy producers. “In 2026, between 800 and 1,200 hours. For 2027, 2028, and 2029, projections range between 1,000 and 1,500 hours.”

..............................
https://www.pv-magazine.com/2024/08/16/ ... gy-prices/

Re: Politique énergétique aux Pays-Bas

par energy_isere » 24 juil. 2024, 23:09

Totalénergies rachète 50 % du parc éolien en mer néerlandais Oranjewind à RWE
Totalénergies et RWE ensemble le projet de parc éolien en mer Oranjewind de 795 MW aux Pays-Bas. La major pétrolière française a signé des accords avec l’énergéticien allemand pour y prendre une participation de 50 %.

Image
Le parc Oranjewind injectera de l’électricité renouvelable dans le réseau néerlandais mais servira aussi à alimenter des électrolyseurs pour produire de l’hydrogène vert. | RWE

Loïc FABRÈGUES. Publié le 24/07/2024 Le marin

Attribué en 2022 à RWE dans le cadre de l’appel d’offres Hollandse kust west (HKW) VII, le projet des Pays-Bas Oranjewind de 795 MW a un nouvel actionnaire. Totalénergies a indiqué, mercredi 24 juillet, s’être mis d’accord avec l’énergéticien allemand pour en racheter 50 %. Les deux partenaires ont aussi pris la décision finale d’investissement pour réaliser le projet. Les principaux partenaires comme Vestas pour la fourniture des éoliennes ou Jan de Nul pour la pose des fondations et des turbines ont déjà... abonnés
https://lemarin.ouest-france.fr/energie ... 01f2d4302d

Re: Politique énergétique aux Pays-Bas

par energy_isere » 14 juil. 2024, 09:05

Corre and SemperPower to build €300m battery storage plant in Netherlands
The battery storage facility is projected to offset the emission of more than 70,000 tonnes of carbon dioxide per year and will serve as a major grid balancing solution for the Netherlands

Staff Writer 8th Jul 2024

orre Energy has established a joint venture (JV) with SemperPower to develop a two-hour 320MW battery storage project in the Netherlands with an investment of around €300m.

SemperPower is owned by renewable energy investment platform Return Energy. The Dutch firm is engaged in developing, financing, and operating battery energy storage systems (BESS).

Corre Energy, which is also based in the Netherlands, is involved in the development and operation of long duration energy storage (LDES) projects and products.

SemperPower and Corre Energy will build their battery storage facility at the latter’s Zuidwending site. The project will have a total capacity of 640MWhrs.

It is expected to serve as a key grid balancing solution for the Netherlands. The battery storage project will also address the growing supplies of intermittent renewable energy apart from delivering a positive impact on both the society and the environment.

Through the Dutch battery storage facility, both companies aim to eliminate emission of more than 70,000 tonnes of carbon dioxide per year.
...........................
https://www.nsenergybusiness.com/news/c ... s/?cf-view

Re: Politique énergétique aux Pays-Bas

par energy_isere » 30 juin 2024, 22:53

Lion Storage secures permit for 1.5 GWh battery project in the Netherlands
Dutch developer Lion Storage has secured an irrevocable building permit for its 364 MW/1457 MWh battery energy storage project located in the Vlissingen port, in the southwestern Netherlands.

JUNE 26, 2024 MARIJA MAISCH

Image
A rendering of the Mufasa storage project Image: Lion Storage

After unveiling the project earlier this year, Dutch developer Lion Storage announced Monday that its flagship battery energy storage system (BESS) project Mufasa has reached a major milestone as its building permit had been granted irrevocably.

With a power output of 364 MW and a capacity of 1457 MWh, the project is poised to claim the title of the largest utility-scale BESS in the Netherlands once operational.

Mufasa will be strategically located in the Vlissingen Port (North Sea Port), one of the upcoming energy hubs in the southwestern Netherlands.

The project will have direct access to TenneT’s high-voltage grid and be situated close to several large-scale hydrogen electrolysis and offshore wind projects under development. It is slated to start commercial operation in 2026.
https://www.pv-magazine.com/2024/06/26/ ... therlands/

Re: Politique énergétique aux Pays-Bas

par energy_isere » 17 avr. 2024, 21:13

suite de ce post du 1er oct 2023 http://www.oleocene.org/phpBB3/viewtopi ... 2#p2377582
Pays-Bas : Le plus grand gisement de gaz naturel d’Europe définitivement fermé

20 Minutes avec AFP le 17/04/2024

Le Sénat néerlandais a approuvé la fermeture définitive des vannes du gisement de gaz naturel de Groningue (nord), le plus grand d’Europe. Son exploitation était à l’origine de séismes qui ont secoué des riverains durant des décennies. Le robinet sera définitivement coupé le 1er octobre 2024, un an après la fin de l’exploitation du gisement et après des années de lutte politique.

« Le gouvernement souhaite ainsi apporter plus de clarté et de certitude quant à la fin définitive de l’extraction de gaz », a déclaré dans un communiqué mardi soir la Chambre haute. Les autorités maintenaient depuis octobre dernier des unités d’extraction opérationnelles en cas d’hiver « très rigoureux », sur fond de tensions géopolitiques persistantes.

Exploité depuis 1963

Le gisement était exploité depuis 1963 mais depuis plus de vingt ans, la population subit des séismes de faible magnitude proches de la surface, en raison des poches de vide formées lors de l’extraction de gaz, qui ont provoqué de nombreux dégâts. Après s’être réjouis en 2018 de la fermeture annoncée du gisement, les riverains ont déchanté face aux avertissements d’experts selon lesquels les séismes pourraient continuer durant des années.

Nombre d’entre elles se sont également retrouvées face à un bourbier juridique et technique relatif aux indemnisations. Et si l’extraction de gaz a petit à petit été presque réduite à néant, La Haye a décidé en 2022 de reporter la fermeture des vannes en raison des incertitudes énergétiques mondiales en grande partie provoquées par l’invasion de l’Ukraine par la Russie. « Une dette d’honneur doit être payée à la population de Groningen, en premier lieu en accélérant le renforcement des bâtiments et le règlement des dégâts », a déclaré le Sénat.

Un groupe de campagne d’habitants, le Groningen Bodem Beweging (GBB), a qualifié la loi de « moment historique », se disant « heureux et soulagés », même si la décision est « douce-amère ». Les critiques de la décision ont exprimé des inquiétudes quant à la sécurité de l’approvisionnement en gaz aux Pays-Bas, en particulier compte tenu des incertitudes suscitées par l’invasion de l’Ukraine par la Russie.
https://www.20minutes.fr/monde/4086922- ... ment-ferme

Re: Politique énergétique aux Pays-Bas

par energy_isere » 30 mars 2024, 22:24

Dutch PV additions hit 4.82 GW in 2023
The Netherlands deployed 4.82 GW of new solar capacity in 2023. The country’s cumulative installed PV capacity hit 24.4 GW at the end of December.

MARCH 25, 2024 EMILIANO BELLINI

The Dutch solar market gained 4.82 GW of new PV capacity in 2023, according to the “Nationaal Solar Trendrapport 2023” study, which was recently published by consultancy Dutch New Energy (DNE) Research.

The country reached 24.4 GW of cumulative installed solar capacity at the end of December 2023.

By comparison, newly deployed PV systems hit 4.8 GW in 2022, 3.7 GW in 2021, 3.9 GW in 2020, 2.57 GW in 2019, 1.69 GW in 2018, and 853 MW in 2017.

Of the new capacity installed last year, around 2.5 GW came in the form of residential installations – up from 2.2 GW a year earlier. The remaining 2.4 GW of capacity came from the commercial and industrial and large-scale market segments.

DNE Research estimates that the Netherlands could reach an installed PV capacity of 59 GW by 2030 and 98 GW by 2035.

According to a recent report by Netbeheer Nederland, the Dutch association of national-regional electricity and gas network operators, the country could reach between 100 GW and 180 GW of total installed solar capacity by 2050.

The “regional scenario” forecasts the largest expansion of PV, up to 180 GW of installed capacity. In its previous version, this scenario predicted just 125 GW. The installed solar capacity would come from 58 GW of utility-scale PV and 125 GW of rooftop systems, with 67 GW on commercial and industrial buildings and 58 GW on residential structures.
https://www.pv-magazine.com/2024/03/25/ ... w-in-2023/

ce pays tellement plus petit que la France a plus de puissance solaire PV que la France ( 20.0 GW pour la France) !

Re: Politique énergétique aux Pays-Bas

par energy_isere » 29 févr. 2024, 19:10

L’Allemagne et les Pays-Bas viennent chacun de lancer un nouvel appel d’offres pour l’éolien en mer. Deux procédures qui portent sur près de 10 GW à attribuer, soit près d’un tiers des capacités en service en Europe.

Image
Les secteurs Alpha et Beta dans la zone Ijmuiden ver aux Pays-Bas ont été mis en appel d’offres. Le secteur Gamma doit l’être l’an prochain. | NEDERLANDSE WINDENERGIE ASSOCIATIE (NWEA)

Loïc FABRÈGUES. Publié le 29/02/2024 Le marin

Lors de la publication de son bilan annuel des nouvelles capacités d’éoliens en mer installées en Europe en 2023, Windeurope évaluait l’enveloppe des appels d’offres à venir en 2024 pour la filière à 40 GW. Si tous les pays lançaient leurs procédures , précisait le porte-parole de la filière de l’éolien à Bruxelles. Les premiers mois de l’année sont prometteurs pour confirmer cette perspective. ( .... abonnés)
https://lemarin.ouest-france.fr/energie ... 60257def44

Re: Politique énergétique aux Pays-Bas

par energy_isere » 25 déc. 2023, 22:34

suite de ce post du 24 juin 2023 http://www.oleocene.org/phpBB3/viewtopi ... 9#p2372139
The Netherlands hits offshore wind target of 4.5 GW with Hollandse Kust Noord wind park

By NS Energy Staff Writer 21 Dec 2023

The Hollandse Kust Noord wind park, located 18.5 kilometres off the coast of Egmond aan Zee, became operational on December 20.

With Hollandse Kust Noord, CrossWind has built a subsidy-free wind park that is expected to produce at least 3.3 TWh of electricity. This corresponds to 2.8 percent of electricity demand in the Netherlands. Hollandse Kust Noord, together with other offshore wind parks including Borssele and Hollandse Kust Zuid, currently supply 15.8 percent of the Netherlands’ electricity needs, a goal that was agreed more than 10 years ago in the Dutch Energy Agreement in its “Roadmap 2023”.

The Hollandse Kust Noord wind park, located 18.5 kilometres off the coast of Egmond aan Zee, became operational on December 20. The wind park was built by CrossWind, a joint venture between Shell and Eneco. It will add 759 MW of renewable energy to the Dutch electricity grid after final commissioning. The completion of Hollandse Kust Noord will achieve a target in the Netherlands of more than 4.5 GW of offshore wind by the end of 2023.
..........................
https://www.nsenergybusiness.com/news/t ... wind-park/

Re: Politique énergétique aux Pays-Bas

par energy_isere » 21 déc. 2023, 21:24

Les Pays-Bas veulent mieux surveiller les fonds marins de mer du Nord
Dans une lettre adressée aux parlementaires, le ministère de la Défense des Pays-Bas annonce vouloir investir jusqu’à 250 millions d’euros pour protéger les câbles et pipelines qui passent le long des côtes néerlandaises. Deux navires sont aussi prévus.


Stéphane GALLOIS. lemarin le 21/12/2023

Caméras, radars et récepteurs AIS font partie de la panoplie de systèmes que le gouvernement néerlandais souhaite déployer au large pour protéger les infrastructures vitales en mer du Nord . Selon la lettre adressée aux parlementaires par le ministre de la Défense, le 19 décembre, un budget de 50 à 250 millions d’euros pourrait être alloué à l’acquisition de capacités ISR (intelligence, surveillance et reconnaissance) en mer.
https://lemarin.ouest-france.fr/defense ... 8f8ee105c7

Re: Politique énergétique aux Pays-Bas

par energy_isere » 17 déc. 2023, 20:47

Mise en service de deux pistes cyclables photovoltaïques Wattway aux Pays-Bas
Les deux pistes cyclables produiront 160 MWh/an d’énergie renouvelable durant la première année, contribuant à l’approvisionnement du réseau néerlandais en électricité photovoltaïque, sans artificialiser de nouvelles surfaces.

DÉCEMBRE 15, 2023 GWÉNAËLLE DEBOUTTE

Image
Pistes cyclables photovoltaïques Wattway aux Pays-Bas. Image : Capa Pictures

L’entreprise française de travaux publics Colas et la société néerlandaise de construction BAM Royal Group ont mis en service deux pistes cyclables équipées du revêtement photovoltaïque Wattway aux Pays-Bas. D’une superficie de 1 000 m² chacune, elles ont été commandées par les provinces de Brabant-Septentrional et de Hollande-Septentrionale. Il s’agit du premier projet de cette ampleur dans le pays.

Issu de la R&D de Colas, en partenariat avec l’Institut National de l’Energie Solaire (CEA-INES), le revêtement photovoltaïque Wattway est commercialisé depuis 2019 et offre aujourd’hui une puissance accrue, qui est passée de 119 Wc/m² à 148 Wc/m². Comme l’explique l’entreprise Colas, les innovations industrielles sur les cellules photovoltaïques, additionnées au nouvel agencement des cellules, désormais pleines et alignées, ont permis d’accroître la performance énergétique de la nouvelle dalle de 21 % au mètre carré. Chaque module déploie ainsi une puissance de 18,2 %. D’autre part, la robustesse des dalles a également été améliorée grâce à une nouvelle formulation du multicouche de résine qui enserre les cellules. Enfin, l’architecture électrique a été repensée pour réduire la quantité de câblage.

Les deux pistes cyclables produiront 160 MWh/an d’énergie renouvelable durant la première année, contribuant à l’approvisionnement du réseau néerlandais en électricité photovoltaïque, sans mobiliser de foncier, compte tenu de la superficie du pays. La production d’énergie photovoltaïque par les infrastructures de transport, et notamment les pistes cyclables étendues sur 35 000 km aux Pays-Bas, représente en effet un potentiel intéressant, sans artificialiser de nouvelles terres.
https://www.pv-magazine.fr/2023/12/15/m ... -pays-bas/

Bon, rendez vous dans disons 2 ans pour voir si ça tient ses promesses et comment ça se dégrade. On a eu comme une mauvaise expérience en France avec une route solaire qui a assez mal finie.

Re: Politique énergétique aux Pays-Bas

par energy_isere » 16 déc. 2023, 11:40

Les Coréens en pole position pour 2 nouveaux réacteurs :
Feasibility study for Korean reactors at Borssele

14 December 2023

Korea Hydro & Nuclear Power (KHNP) has been contracted to conduct a feasibility study into the construction of two Korean-supplied reactors at the Borssele nuclear power plant site in the Netherlands. The contract comes as the South Korean and Dutch governments sign a memorandum of understanding to cooperate on nuclear energy.

Image
President Yoon speaking at the Netherlands-Korea Business Forum (Image: Presidential Office)

In a statement, the Dutch government said KHNP will begin the feasibility study in January. It will consider whether the reactor design complies with Dutch legislation and regulations, whether it can be fitted into the preferred location at Borssele, and will develop a more detailed estimate of the costs and time required to build the two new units. The possible impact on the environment is also highlighted in the studies. The study is expected to last at least six months.

This is the first of three such contracts, the government said, noting that contracts with Westinghouse of the USA and EDF of France "will follow soon".

"These studies are necessary to determine whether it is technically possible and safe to build new nuclear power stations at the preferred location in Borssele," it said. "An independent party will then evaluate the technical feasibility studies. The first results are expected to be shared in the autumn of 2024."

In December 2021, the Netherlands' new coalition government placed nuclear power at the heart of its climate and energy policy. Based on preliminary plans, two new reactors will be completed around 2035 and each will have a capacity of 1000-1650 MWe. The two reactors would provide 9-13% of the Netherlands' electricity production in 2035. The cabinet announced in December 2022 that it currently sees Borssele as the most suitable location for the construction of the new reactors.

"Nuclear energy helps us on our way to a CO2-free energy system. That is why we are busy preparing for the arrival of two new nuclear power stations," said Minister for Climate and Energy Policy Rob Jetten. "The three parties that are eligible for this new construction will carry out technical feasibility studies in the coming year. The South Korean builder KHNP is now the first to start. We have had good discussions with this company and my South Korean colleagues recently. And I am pleased that our French and American colleagues will soon be able to get to work too. An important milestone."

Cooperation agreement

The signing of the contract with KNHP came during a state visit by South Korean President Yoon Suk Yeol to the Netherlands. Also during the visit, a memorandum of understanding (MoU) on cooperation in nuclear energy was signed between the two governments.

A joint statement from President Yoon and Prime Minister Mark Rutte said: "The two leaders recognised the role nuclear energy can play in enhancing energy security, combatting climate change and reaching carbon neutrality, and agreed to maintain and further develop bilateral cooperation on nuclear energy topics such as construction and operation of nuclear power plants; workforce development; nuclear fuel; safety; and innovation of gigawatt-scale nuclear reactors, small modular reactors and other advanced nuclear reactors."

In a separate statement, Yoon said: "Based on the nuclear power plant cooperation MoU signed today, we will actively support Korean companies with the world's best construction competitiveness to participate in the new nuclear power plant project in the Netherlands."
https://www.world-nuclear-news.org/Arti ... t-Borssele

Re: Politique énergétique aux Pays-Bas

par energy_isere » 11 nov. 2023, 23:38

en rapport avec ce post du 20 octobre 2023 http://www.oleocene.org/phpBB3/viewtopi ... 6#p2378626
'Largest in Europe' | Air Products announces blue hydrogen plant at Rotterdam linked to Dutch offshore CCS network
The US industrial gases firm will supply H2 to existing customers including ExxonMobil’s refinery

By Polly Martin 7 November 2023

US industrial gases company Air Products has announced it will build, own and operate technology to capture carbon emissions from its existing hydrogen plant in Rotterdam, thus turning its grey H2 blue.

The grey hydrogen facility has 300 tonnes a day of H2 capacity, and Air Products claims that after the retrofit, this will be the largest blue hydrogen facility in Europe once operational in 2026.

Image

Air Products plans to store the CO2 captured from its Rotterdam hydrogen facility via the Netherlands’ flagship Porthos CCS project.

Porthos, developed by a joint venture between state-owned firms EBN, Gasunie, and the Port of Rotterdam Authority, aims to transport 2.5 million tonnes of CO2 a year over the next 15 years to depleted gas fields offshore for storage 3-4km under the seabed.

The project, which reached final investment decision (FID) earlier this month, has already contracted all 37 million tonnes of storage capacity to four industrial emitters in Rotterdam that had signed joint development agreements: Air Products, fellow industrial gas company Air Liquide, and oil majors Shell and ExxonMobil.

These four companies were in 2021 awarded €2.1bn ($2.26bn) in grants via the Dutch government’s SDE++ scheme, covering the cost gap between the price of the EU’s carbon credits on the Emissions Trading System and the costs involved in developing CCS infrastructure.

Air Products lists ExxonMobil’s refinery in Rotterdam — already an existing customer for grey hydrogen — as an offtaker for its blue H2 once the project is onstream.

While the industrial gases firm notes that the blue hydrogen plant is backed by a long-term contract with ExxonMobil, it does not provide further details on this agreement.

“Air Products has been actively present and investing in Rotterdam for decades,” said the firm’s chief operating officer Samir Serhan.

“Industrial companies here are continually looking for ways to realise synergies, create economies of scale, drive energy efficiencies and ultimately decarbonise. This project fulfils that demand.

“By sequestering CO2 through Porthos and bringing additional blue hydrogen to ExxonMobil and other customers, we can help generate a cleaner future.”

Blue hydrogen would theoretically reduce the emissions footprint of ExxonMobil and other industrial H2 users in the region, reducing not only the need for extra carbon allowances under the EU's Emissions Trading System, but also future payouts to the Dutch government from a strict carbon tax on oil, chemicals and steel companies — passed in 2021 — which will rise to €125 per tonne of CO2 by 2030.

..........................
https://www.hydrogeninsight.com/product ... -1-1549667

Re: Politique énergétique aux Pays-Bas

par energy_isere » 05 nov. 2023, 11:43

The Hydrogen Stream: Netherlands starts building hydrogen network

OCTOBER 31, 2023

Gasunie said this week that the authorities in the Netherlands have started building a national hydrogen network.
Contractor Visser & Smit Hanab will build the first section of the national grid. From 2030, the national hydrogen network, which will cost around €1.5 billion ($1.6 billion) to build, will connect major industrial areas across the country, as well as points in Germany and Belgium. Last year, the Dutch government contracted Gasunie to develop the hydrogen network. The first section, stretching over 30 kilometers, will be built in Rotterdam and will connect the Tweede Maasvlakte industrial park to Pernis. It is expected to be operational in 2025. Around 85% of the Dutch hydrogen network will feature repurposed natural gas pipelines.
https://www.pv-magazine.com/2023/10/31/ ... n-network/

Re: Politique énergétique aux Pays-Bas

par energy_isere » 14 oct. 2023, 14:01

Les Pays-Bas allouent 416 millions d’euros pour le stockage stationnaire
Alors que le solaire photovoltaïque progresse rapidement dans le pays, le gouvernement soutient la construction de batteries connectées à des centrales au sol ou à de grands systèmes photovoltaïques en toiture.

OCTOBRE 13, 2023 EMILIANO BELLINI

Le gouvernement néerlandais allouera les fonds de son paquet climat publié au printemps dernier, pour faciliter le déploiement de 160 MW à 330 MW de stockage par batterie, pour des subventions allant jusqu’à 416,6 millions d’euros.

Dans le même temps, l’opérateur de réseau TenneT a introduit un nouveau contrat pour fournir des frais de transmission de réseau réduits aux opérateurs de batteries et autres capacités flexibles, offrant des réductions potentielles allant jusqu’à 65 %. L’Autorité néerlandaise pour les consommateurs et les marchés (ACM) déterminera les tarifs actualisés d’ici le printemps prochain.

« Cela facilite la connexion des batteries au réseau électrique néerlandais, a déclaré le gouvernement. Les opérateurs de batteries qui utilisent cette forme de contrat doivent, sur demande, aider l’opérateur de réseau à limiter la congestion du réseau. Par exemple, en chargeant ou en fournissant moins d’électricité aux heures où une grande quantité d’électricité est transportée ».

Les recherches commandées par TenneT suggèrent que ces frais de réseau réduits pourraient stimuler l’ajout de 2 GW à 5 GW de nouvelles capacités de batteries d’ici à 2030. Les Pays-Bas doivent en effet rapidement renforcer leur réseau électrique et trouver des flexibilités alors qu’ils prévoient de déployer une capacité solaire substantielle dans les années à venir. En réponse aux limitations du réseau, le fournisseur Liander a mis en œuvre diverses mesures dans les zones confrontées à des goulets d’étranglement, notamment l’installation de deux grands transformateurs et la gestion de la congestion. TenneT a également créé une carte interactive en ligne qui met en évidence les zones de réseau congestionnées à travers le pays.

En juin 2022, les Pays-Bas disposaient d’une capacité photovoltaïque installée cumulée de 16,5 GW, avec 3 803 MW ajoutés en 2021 et 3 882 MW en 2022, selon l’agence nationale des statistiques, CBS.
https://www.pv-magazine.fr/2023/10/13/l ... tionnaire/

Haut