Dubai / Abu Dhabi / Émirats Arabes Unis

Répondre


Cette question vous permet de vous prémunir contre les soumissions automatisées et intensives effectuées par des robots malveillants.
Émoticônes
:D :geek: :ugeek: :ghost: :wtf: :-D :) :-) :-( :-o :shock: :? 8-) :lol: :-x :-P :oops: :cry: :evil: :twisted: :roll: ;) ;-) :!: :?: :idea: :arrow: :-| :mrgreen: =D> #-o =P~ :^o [-X [-o< 8-[ [-( :-k ](*,) :-" O:) =; :-& :-({|= :-$ :-s \:D/ :-#
Plus d’émoticônes

Le BBCode est activé
La balise [img] est activée
La balise [flash] est activée
La balise [url] est activée
Les émoticônes sont activées

Relecture du sujet
   

Agrandir Relecture du sujet : Dubai / Abu Dhabi / Émirats Arabes Unis

Re: Dubai / Abu Dhabi / Émirats Arabes Unis

par energy_isere » 04 mars 2025, 01:06

Dubai issues tender for 7th phase of giant solar park
The Dubai Electricity and Water Authority (DEWA) has launched a tender for the seventh phase of the Mohammed bin Rashid Al Maktoum Solar Park, which could add up to 2 GW of PV capacity and 1 GW of battery storage.

February 25, 2025 Emiliano Bellini

DEWA has launched a tender for the construction of the seventh phase of the Mohammed bin Rashid Al Maktoum Solar Park.

The tendered PV facility will have a capacity ranging from 1.6 GW to 2 GW and will be connected to 1 GW of battery capacity, which would be enough to provide six hours of storage.

DEWA said the project will be developed on an independent power project (IPP) basis. The selected developer will secure a long-term power purchase agreement. Developers have until March 25 to express their interest.

DEWA is now in the process of selecting the winners of the sixth phase of the project. The fifth phase of the 5 GW Mohammed bin Rashid Al Maktoum Solar Park has a capacity of 900 MW and is currently under construction.

By October 2022, the Rashid Al Maktoum Solar Park had 1.83 GW of operational PV capacity. This included the 13 MW first phase, 200 MW second stage, the 800 MW third phase. Parts of the fourth and fifth phases are still under development.
https://www.pv-magazine.com/2025/02/25/ ... olar-park/

Re: Dubai / Abu Dhabi / Émirats Arabes Unis

par energy_isere » 14 févr. 2025, 00:21

EWEC issues Request for Proposals for the development of the 140 MW Al Sila wind energy project

February 13, 2025 evwind

Together with existing wind energy assets, this new wind farm will double Abu Dhabi’s wind generation capacity to approximately 240 MW once operational.

EWEC (Emirates Water and Electricity Company), a leading company in the integrated planning, purchasing, supply, and system despatch services of water and electricity across the UAE, today issued a Request for Proposals (RFP) to qualified companies for the development of the Al Sila Wind Independent Power Project (IPP), in close proximity to the existing utility-scale wind farm in Al Sila.

Once fully operational, Al Sila Wind will generate up to 140 megawatts (MW) AC of renewable energy, providing enough generation capacity to power 36,000 homes, and displace 190,000 tonnes of carbon dioxide annually. The project builds on Abu Dhabi’s existing wind farms located at Sila, Sir Bani Yas Island and Delma Island, and will increase Abu Dhabi’s wind generation capacity to approximately 240MW.
.............................
https://www.evwind.es/2025/02/13/ewec-i ... ect/104385

Re: Dubai / Abu Dhabi / Émirats Arabes Unis

par energy_isere » 22 janv. 2025, 20:34

Face à la chaleur extrême, Dubaï veut climatiser une voie piétonne de 2 kilomètres de long
22 janvier 2025
https://www.usinenouvelle.com/article/f ... g.N2225973

Re: Dubai / Abu Dhabi / Émirats Arabes Unis

par energy_isere » 19 janv. 2025, 19:54

suite de ce post du 16 novembre 2023 viewtopic.php?p=2380292#p2380292

Visite à la centrale solaire PV de 2 GW de Al Dhafra
A closer look at Al Dhafra, Abu Dhabi’s 2 GW desert wonder
The 2 GW Al Dhafra solar park covers an area of 21.5 square km in the sandy outskirts of the suburb Dhafra near Abu Dhabi. pv magazine visited to get the lowdown on the plant’s specs and how it is contributing to the local energy landscape.

January 15, 2025 Blathnaid O'Dea

Image
The 2 GW Dhafra solar farm Image: EWEC

Image
................................
https://www.pv-magazine.com/2025/01/15/ ... rt-wonder/

Re: Dubai / Abu Dhabi / Émirats Arabes Unis

par energy_isere » 14 janv. 2025, 22:21

Les Émirats arabes unis annoncent un important projet de centrale solaire avec batteries

AFP le 14 janvier 2025

Les Emirats arabes unis ont annoncé mardi la construction d'une centrale solaire géante avec stockage par batterie, permettant de fournir de l'électricité décarbonée en continu.

5 GW de capacités solaires

La société émiratie d'énergies renouvelables Masdar va lancer "la première installation d'énergies renouvelables au monde capable de fournir de l'énergie à grande échelle 24 heures sur 24", a déclaré son patron, Sultan al-Jaber, qui occupe aussi le poste de ministre de l'Industrie.

Le projet, mené en partenariat avec le fournisseur d'électricité et d'eau émirati EWEC, "associera 5 GW de capacité solaire à 19 GWh de stockage pour produire 1 GW d'énergie renouvelable ininterrompue", a-t-il indiqué à l'inauguration du sommet d'Abu Dhabi Sustainability Week, un événement qui se déroule sur plusieurs jours dans la capitale émiratie.

La centrale devrait être opérationnelle en 2027, avec un coût estimé à environ 6 milliards de dollars, selon Masdar. "C'est un premier pas qui pourrait devenir un pas de géant", a souligné M. Jaber.

COP28 en 2023

Le pays du Golfe figure parmi les principaux exportateurs de pétrole au monde. Mais il investit massivement aussi dans les énergies propres. Il a accueilli en 2023 la conférence mondiale pour le climat, COP28, qui avait appelé à une sortie progressive des énergies fossiles.

"Le stockage par batterie est la technologie énergétique qui connaît aujourd'hui la plus forte croissance dans le monde", mais elle ne représente "qu'une infime partie de la demande globale d'énergie", a souligné le responsable émirati, qui dirige aussi le géant des hydrocarbures Adnoc.

Face à l'explosion prévue de la consommation d'électricité, tirée notamment par l'utilisation de l'intelligence artificielle, il faut une "diversité d'options", a-t-il martelé. "Les politiques et les réglementations qui réduisent prématurément ces options sont contre-productives", a encore dit le responsable émirati.
https://www.connaissancedesenergies.org ... ies-250114

Re: Dubai / Abu Dhabi / Émirats Arabes Unis

par energy_isere » 11 janv. 2025, 20:23

ADNOC Gas awards three contracts worth $2.1bn for key LNG supply infrastructure
The new infrastructure will support the Ruwais LNG export facility, which is set to more than double ADNOC Gas’ LNG production capacity

Aninda Chakraborty 10th Jan 2025

ADNOC Gas, along with its subsidiaries, has announced the awarding of three major contracts worth $2.1bn.

These contracts aim to establish critical infrastructure, including a liquefied natural gas (LNG) pre-conditioning plant (LPP), compression facilities, and transmission pipelines, to supply feedstock to the Ruwais LNG Project.

The LPP and compression facilities will be located at ADNOC Gas’ Habshan 5 plant, part of the larger Habshan Complex, one of the world’s largest integrated gas processing facilities.

The complex, consisting of five plants, has a combined processing capacity of 6.1 billion standard cubic feet of gas per day. The newly awarded transmission pipelines will connect the Habshan Complex to the Ruwais LNG facility.

The $1.24bn LNG Pre-conditioning Plant (LPP) contract was awarded to a consortium comprising Engineering for the Petroleum and Process Industries (ENPPI) and Petrojet, while the China Petroleum Pipeline Engineering Company received a $514m contract for developing the pipelines.

Petrofac Emirates secured a $335m contract to construct the new compression facilities.

ADNOC Gas CEO Fatema Al Nuaimi said: “These contract awards reaffirm ADNOC Gas’ commitment to delivering sustainable growth and maximising shareholder value. We are investing in world-class infrastructure and innovative technologies as we expand our capacity in LNG liquefaction and strengthen our position as a global player.”

These contracts form part of ADNOC Gas’ strategy to establish essential infrastructure for the Ruwais LNG Project, which is being developed on behalf of the Company’s largest shareholder, ADNOC.

The capital expenditure (CAPEX) for these projects is separate from the costs outlined for ADNOC Gas’ planned acquisition of ADNOC’s majority stake in the Ruwais LNG Project, anticipated to become operational in 2028.

This investment aligns with ADNOC Gas’ $15bn CAPEX plan through 2029, as highlighted in the Company’s recent strategic update.

The new infrastructure will support the Ruwais LNG export facility, which is set to more than double ADNOC Gas’ LNG production capacity, increasing it to over 15 million tonnes per annum (mtpa).

The Ruwais LNG plant will feature two liquefaction trains, each with a processing capacity of 4.8 mtpa. The facility will be powered by clean grid electricity, a first for LNG operations in the Middle East and North Africa (MENA) region.

Upon completion, the Ruwais LNG plant aims to be one of the world’s lowest-carbon intensity LNG facilities.
https://www.nsenergybusiness.com/news/a ... e/?cf-view

Re: Dubai / Abu Dhabi / Émirats Arabes Unis

par energy_isere » 28 déc. 2024, 19:35

EWEC locks down land for 4.6 GW of solar, wind in Abu Dhabi
Emirates Water and Electricity Co. (EWEC) says it has secured four sites in the United Arab Emirates to develop 4.6 GW of solar and wind projects.


December 27, 2024 Brian Publicover

EWEC said it has secured four sites in Abu Dhabi to develop 4.6 GW of renewable energy projects, including PV and wind power installations.

It claimed that the projects, spanning 75 square km in total, represent a critical step in achieving Abu Dhabi’s Clean Energy Strategic Target 2035 and the commitment to net zero in the United Arab Emirates by 2050.

The developments will include three solar plants in Al Faya, Al Khazna, and Al Zarraf, alongside a wind farm in Sila. The solar facilities are expected to add 4.5 GW (AC) of capacity, while the wind project will contribute 140 MW, supporting EWEC’s target of 10 GW installed PV capacity by 2030 and 18 GW by 2035.

“This is a significant milestone in EWEC's strategic decarbonization of the UAE’s energy sector,” EWEC CEO Othman Al Ali said in an online statement. “This land will facilitate the accelerated commissioning and development of world-leading renewable projects.”

The initiative involves stakeholders such as the Abu Dhabi Department of Energy (DoE), the Environment Agency – Abu Dhabi, and the UAE Ministry of Defence. Ahmed Mohamed Al Rumaithi, undersecretary of the DoE, noted the importance of aligning these efforts with regulatory frameworks to decarbonize the energy sector.

In November, EWEC said it had received three bids from Engie, a consortium of EDF Renewables and Korean Western Power (Kowepo), and a consortium of Jinko Power and Jera to develop the 1.5 GW Khazna solar project in Abu Dhabi, with a contract award planned for the second quarter of 2025.

And in October, the company launched a tender for the 1.5 GW Zarraf solar PV project in Abu Dhabi's Al Dhafra region, as part of its plan to annually install 1.4 GW of new solar capacity from 2027 to 2037.
https://www.pv-magazine.com/2024/12/27/ ... abu-dhabi/

Re: Dubai / Abu Dhabi / Émirats Arabes Unis

par energy_isere » 16 nov. 2024, 00:59

ADNOC Gas Plans $15B Capex for Next Five Years, Driven by UAE Gas Demand

by Jov Onsat|Rigzone Staff | Friday, November 15, 2024

The integrated gas processing unit of Abu Dhabi National Oil Co. (ADNOC) said it has raised its planned 2025–29 capex of $13 billion to $15 billion to capitalize on growing domestic demand for natural gas.

“In the UAE, the annual growth in gas demand to 2030 is expected to be 6 percent, versus an expected 2 percent at the time of the IPO [initial public offering]”, ADNOC Gas said in a statement. “This strong increase in demand will be driven by higher economic activity, population growth and industrial expansion, underpinned by AI data centers and the food industry”.

During the five years, ADNOC Gas aims to complete three gas projects, including the Big Oil-backed Ruwais LNG. Targeted to start production 2028, the 9.6 million tons per annum facility would more than double ADNOC’s LNG output.

The other two are the Maximization of Ethane Recovery and Monetization Project, which is planned to produce up to 3.4 million tonnes per annum (MMtpa) of ethane and natural gas liquids, and the IGD-E2 project, designed to have a gas processing capacity of 370 million cubic feet per day.

Earlier, however, ADNOC Gas canceled the Das Island LNG 2.0 project.

“The updated growth strategy also advances the design and concept study of large-scale pre-FID projects to accommodate a significant increase in the company’s gas processing capabilities as ADNOC expands its upstream production capacity, as well as the Bab Gas Cap project, which are expected to be completed after 2029”, added the online statement.

ADNOC Gas expects Bab Gas Cap, which will serve the onshore Bab field, to add 1.9 billion cubic feet per day of processing capacity.

...........................
...........................
https://www.rigzone.com/news/adnoc_gas_ ... 5-article/

Re: Dubai / Abu Dhabi / Émirats Arabes Unis

par Gerardo » 03 nov. 2024, 12:08

En tout cas, ils préparent bien leur sortie du pétrole avec une économie qui en dépend de moins en moins avec moins de 70% des recettes, ils ont bien bosser. C'est spur qu'avec Dubaï dans l'économie du luxe avec les hôtels, les parfums, la société de consommation à outrance, l'immobilier et le hub portuaire y a de qui faire. Surtout qu'os investissent partout à l'étranger. Beaucoup les voient comme des gens qui ne savent pas quoi faire des pétro dollars mais c'est faux. Les émirats sont des gens très pragmatiques qui travaillent pour l'indépendance financière de leur pays car ils savent que les énergies fossiles chez eux auront un terme.

Leur perspective d'avenir est donc très bonne.

Re: Dubai / Abu Dhabi / Émirats Arabes Unis

par energy_isere » 07 oct. 2024, 23:37

EWEC opens 1.5 GW solar tender in Abu Dhabi
Through the procurement exercise, the Emirates Water and Electricity Co. (EWEC ) is planning to build a giant solar farm in the Al Dhafra Region.

October 2, 2024 Emiliano Bellini

Abu Dhabi's Emirates Water and Electricity Co. (EWEC ) has launched a tender for the construction of a 1.5 GW solar power plant in the Al Dhafra Region.

The utility said that the developer of the Zarraf Solar PV project will be awarded a long-term power purchase agreement (PPA), without providing further technical or financial details.

“Zarraf Solar PV is EWEC’s fifth world-leading utility-scale solar PV project, supporting the acceleration of renewable and clean energy capacity in the UAE under EWEC’s strategic plan to build an average of 1.4 GW of new solar PV capacity annually between 2027-2037,” the utility stated.
https://www.pv-magazine.com/2024/10/02/ ... u-dhabi-2/

Re: Dubai / Abu Dhabi / Émirats Arabes Unis

par energy_isere » 22 sept. 2024, 22:18

suite de ce post du 4 mai 2024 http://www.oleocene.org/phpBB3/viewtopi ... 3#p2390573
EDF, Masdar secure financing for 1.5 GW of solar near Abu Dhabi
EDF Renewables, Korea Western Power Co. (Kowepo), and Masdar have secured financing to build a 1.5 GW solar plant near Abu Dhabi, backed by a 30-year power purchase agreement (PPA) with Emirates Water and Electricity Co.

September 19, 2024 Patrick Jowett

EDF Renewables, Kowepo, and Masdar have revealed plans to build a 1.5 GW solar plant near Abu Dhabi.

The project has secured financing from six banks and financial institutions: BNP Paribas, Credit Agricole CIB, Standard Chartered Bank, HSBC Middle East, Sumitomo Mitsui Banking Corp., and Export-Import Bank of Korea.

A project company – jointly owned by EDF Renewables and Kowepo with 20% stakes each, and Masdar with a 60% stake – will design, build, and operate the plant. The project company signed a 30-year PPA with Emirates Water and Electricity Co. in April.

The Al Ajban Solar Photovoltaic project, located about 70 km northeast of Abu Dhabi, will feature 3 million solar panels on single-axis trackers. The plant, featuring advanced bifacial technology, will generate enough power for 160,000 households in the United Arab Emirates.

Once fully commissioned by the third quarter of 2026, the plant will rank among the world’s largest single-site solar facilities. It will also become the UAE’s third utility-scale solar park.

“Partnerships are vital to the energy transition and to achieving the objective of tripling global renewable capacity by 2030 set out in the UAE Consensus,” said Masdar CEO Mohamed Jameel Al Ramahi. “With the development of Al Ajban, Abu Dhabi is home to three of the largest single-site solar plants in the world, making it a global leader in the adoption of utility-scale solar power.”
https://www.pv-magazine.com/2024/09/19/ ... abu-dhabi/

Re: Dubai / Abu Dhabi / Émirats Arabes Unis

par energy_isere » 30 juil. 2024, 00:20

L’émirati Adnoc commande des méga-transporteurs d’éthane et d’ammoniac
Après le rachat de l’armateur pétrolier Navig8, l’émirati Adnoc L & S signe, avec un partenaire chinois, une méga-commande en Chine pour onze navires qui seront, dans leur domaine, les plus grands du monde. Un contrat qui pourra aller jusqu’à 1,9 milliard de dollars.

Thibaud TEILLARD. le 29/07/2024 Le marin

Basée à Abu Dhabi, AW Shipping, la coentreprise créée en 2020 entre Adnoc logistics & services (Adnoc L & S), filiale du groupe pétrolier émirati éponyme, et le groupe pétrochimique chinois Wanhua chemical group, a confirmé la semaine dernière une énorme commande allant jusqu’à 1,9 milliard de dollars.

Elle porte sur neuf VLEC (very large ethane carriers) ou transporteurs d’éthane de grande taille, 99 000 m3, la plus grande taille mondiale, et jusqu’à quatre navires d’ammoniac qui seront tous construits par le chantier naval chinois de Jiangnan....
abonnés
https://lemarin.ouest-france.fr/shippin ... 26aa35ae01

Re: Dubai / Abu Dhabi / Émirats Arabes Unis

par energy_isere » 21 juil. 2024, 22:43

Masdar raises $1 billion with second green bond
Abu Dhabi-based Masdar has raised $1 billion through a new bond issuance. It says the investment will fund equity commitments on new greenfield projects, several of which are in developing economies.

JULY 19, 2024 PATRICK JOWETT

Abu Dhabi Future Energy Co. (Masdar) has raised $1 billion through its second green bond issuance.

The transaction, carried out under Masdar’s Green Finance Framework, includes dual tranches of $500 million each. The bonds mature in five and 10 years and bear coupons of 4.875% and 5.25%, respectively.

Masdar said there was “strong appetite from regional and international investors” with the orderbook peaking at $4.6 billion, an oversubscription of 4.6 times. The final allocation saw an average split of 70% to international investors and 30% to Middle East and North African investors.

The joint lead managers and bookrunners on the issuance were First Abu Dhabi Bank, Abu Dhabi Commercial Bank, Citibank, HSBC, Standard Chartered, Credit Agricole CIB, Natixis and MUFG.

The $1 billion investment will be deployed to fund equity commitments on new greenfield projects, Masdar said. The company is targeting a portfolio capacity of 100 GW by 2030.
...................................
https://www.pv-magazine.com/2024/07/19/ ... reen-bond/

Re: Dubai / Abu Dhabi / Émirats Arabes Unis

par energy_isere » 10 juil. 2024, 20:35

suite du post au dessus.
Aux Émirats arabes unis, Adnoc octroie 40% d'un projet gazier à 4 compagnies étrangères dont TotalEnergies

AFP le 10 juill. 2024

Le géant des hydrocarbures des Émirats arabes unis, Adnoc, a annoncé mercredi l'attribution de 40% des parts d'un projet gazier à la compagnie française TotalEnergies, aux britanniques Shell et BP, ainsi qu'à la japonaise Mitsui & Co.

Projet GNL de Ruwais

Ces dernières ont acquis "une participation de 10% chacune dans le projet GNL (gaz naturel liquéfié) de Ruwais", à 250 kilomètres à l'ouest d'Abou Dhabi, "Adnoc conservant une participation majoritaire de 60%", a affirmé l'entreprise émiratie dans un communiqué.

Adnoc a également "signé plusieurs nouveaux contrats de vente de GNL à long terme avec des partenaires internationaux, notamment pour la livraison d'un million de tonnes par an (mtpa) de GNL à Shell et de 0,6 mtpa à Mitusi & Co", a-t-elle ajouté.

Le montant des accords n'a pas été dévoilé.

"Nous sommes ravis d'accueillir BP, Mitsui & Co, Shell et TotalEnergies en tant que partenaires du projet (...) qui sera l'une des installations de GNL à plus faible intensité de carbone au monde", a déclaré le directeur exécutif de l'Adnoc, Sultan Al Jaber, durant la cérémonie de signature à Abou Dhabi.

Au lieu des turbines à gaz conventionnelles, l'usine de Ruwais utilisera pour fonctionner des moteurs électriques, alimentés par une centrale nucléaire. Le projet doit produire à terme environ 9,6 millions de tonnes de GNL par an.

COP28
Les Emirats arabes unis, l'un des principaux exportateurs de pétrole au monde, ont accueilli l'année dernière la Conférence mondiale sur le climat, COP28, qui avait appelée à une sortie progressive des combustibles fossiles.

Le GNL est souvent présenté comme une énergie de transition même s'il produit aussi des gaz à effets de serre contribuant au réchauffement de la planète.

La demande pour le gaz a explosé à la suite de l'invasion en février 2022 de l'Ukraine par la Russie, encourageant plusieurs pays du Golfe à augmenter leur production.

L'émirat voisin du Qatar a annoncé cette année de nouveaux projets visant à accroître la production du plus grand gisement de gaz naturel au monde.
https://www.connaissancedesenergies.org ... ies-240710

Re: Dubai / Abu Dhabi / Émirats Arabes Unis

par energy_isere » 06 juil. 2024, 10:42

TotalEnergies : devrait investir dans le grand projet de GNL d'Adnoc aux Émirats

JB.A. Publié le 05/07/2024

TotalEnergies devrait investir dans le projet Ruwais d'Abu Dhabi National Oil Co, qui fera plus que doubler la production de gaz naturel liquéfié des Émirats arabes unis. Selon les informations de 'Bloomberg', le groupe français sera accompagné par trois autres grands groupes énergétiques internationaux, Shell, BP et Mitsui & Co, chacun des quatre acteurs détenant une participation de 10% dans l'usine. Des accords pourraient être signés dès la semaine prochaine, selon les sources. Aucun détail financier n'a filtré.

Les Émirats arabes unis ne disposent actuellement que de 5,8 millions de tonnes de capacité d'exportation de GNL, ce qui en fait le plus petit producteur de la région. L'usine de Ruwais, d'une capacité de 9,6 millions de tonnes par an, permettra à l'émirat de devenir le deuxième producteur de GNL au Moyen-Orient, derrière le Qatar, précise l'agence.

Adnoc a décidé de poursuivre le projet Ruwais et a attribué des contrats de 5,5 milliards de dollars pour sa construction avant d'obtenir les investissements des quatre sociétés internationales. Trois d'entre elles - Mitsui, BP et TotalEnergies - sont également partenaires au sein de la seule usine d'exportation de GNL des Émirats arabes unis, située sur l'île de Das. Le géant pétrolier du Golfe a de grandes ambitions dans le domaine du gaz et du GNL, qu'il considère comme les piliers de sa croissance future, au même titre que les énergies renouvelables et les produits pétrochimiques.

Il y a quelques semaines, Technip Energies a annoncé que sa coentreprise TJN Ruwais avait remporté un contrat dit "majeur" pour l'ingénierie, la fourniture d'équipement et la construction du projet de GNL bas-carbone de Ruwais.
https://www.boursier.com/actions/actual ... 33169.html