Etats-Unis: un grand plan de l'énergie solaire

Répondre


Cette question vous permet de vous prémunir contre les soumissions automatisées et intensives effectuées par des robots malveillants.
Émoticônes
:D :geek: :ugeek: :ghost: :wtf: :-D :) :-) :-( :-o :shock: :? 8-) :lol: :-x :-P :oops: :cry: :evil: :twisted: :roll: ;) ;-) :!: :?: :idea: :arrow: :-| :mrgreen: =D> #-o =P~ :^o [-X [-o< 8-[ [-( :-k ](*,) :-" O:) =; :-& :-({|= :-$ :-s \:D/ :-#
Plus d’émoticônes

Le BBCode est activé
La balise [img] est activée
La balise [flash] est activée
La balise [url] est activée
Les émoticônes sont activées

Relecture du sujet
   

Agrandir Relecture du sujet : Etats-Unis: un grand plan de l'énergie solaire

Re: Etats-Unis: un grand plan de l'énergie solaire

par energy_isere » 13 avr. 2025, 23:22

Robots to work with humans to demonstrate solar module installation
US electrical contractor Rosendin plans to demonstrate robotic-assisted solar module installation at a large-scale solar energy project under construction in Texas.

April 9, 2025 Anne Fischer

Image
Image: Rosendin Renewable Energy Group

Rosendin, an electrical contracting company, announced that its Renewable Energy Group (RREG) will demonstrate its new autonomous robotic solution for solar module installation on April 17 in West Texas.

The three-piece robotic system reportedly can install solar modules three times faster than its human counterparts, while also enhancing worker safety and addressing the industry’s persistent labor shortage.

The labor shortage is more critical than ever as energy installations increase to try to meet the incredible rising load demand caused by the proliferation of data centers and electrification. In a recent webinar conducted by the National Electrical Manufacturers Association (NEMA), Rich Stinson, president and CEO of Southwire, a Chicago-based wire and cable manufacturer, identified the labor shortage as one of the “chokepoints” to meeting the unprecedented demand growth.
......................
https://www.pv-magazine.com/2025/04/09/ ... tallation/

Re: Etats-Unis: un grand plan de l'énergie solaire

par energy_isere » 13 avr. 2025, 23:11

New York’s largest solar power plant moves forward
The 500 MW Cider Solar project received the first permit of its kind issued by the New York Office of Renewable Energy Siting and Transmission.


April 10, 2025 Anne Fischer

The 500 MW Cider Solar Farm, which is to be the largest solar plant in New York State, was approved by the New York Office of Renewable Energy Siting and Transmission (ORES).
.......................
The project started early construction activities in November 2024 and is expected to be complete by Q4 2026, reaching commercial operations by the end of 2026.
https://www.pv-magazine.com/2025/04/10/ ... s-forward/

Re: Etats-Unis: un grand plan de l'énergie solaire

par energy_isere » 22 févr. 2025, 13:59

OCI Energy and Arava Power to form JV for 260MW SunRoper solar farm project
To be built approximately 96.5km southwest of Houston in Wharton County, the SunRoper project will span 2,000 acres as a ground-mounted solar PV installation

Refna Tharayil 21st Feb 2025
...................
https://www.nsenergybusiness.com/news/o ... &cf-closed

Re: Etats-Unis: un grand plan de l'énergie solaire

par energy_isere » 01 févr. 2025, 22:26

Les États-Unis ont ajouté 37 GW de capacité photovoltaïque en 2024
Après un record de 37 GW de nouvelles installations solaires en 2024, l’Energy Information Administration (EIA) prévoit 26 GW en 2025 – et encore moins en 2026.

janvier 28, 2025 Ryan Kennedy

L’énergie solaire a connu une croissance rapide aux États-Unis et à l’étranger, passant de 0,1 % de la production d’électricité aux États-Unis en 2010 à plus de 6 % aujourd’hui, a indiqué la Solar Energy Industries Association (SEIA).

La croissance s’est poursuivie en 2024, avec 37 GW de nouvelles capacités solaires installées aux États-Unis. Cependant, l’Energy Information Administration (EIA) prévoit que cette croissance pourrait se ralentir en 2025. Dans son rapport Short-Term Energy Outlook, l’EIA prévoit que les États-Unis installeront 26 GW en 2025, soit une baisse d’environ 30 % par rapport à l’année record de 2024. De plus, l’EIA prévoit que les États-Unis installeront seulement 22 GW en 2026, ce qui pourrait indiquer un rétrécissement de l’industrie après quinze années de croissance à deux chiffres.
https://www.pv-magazine.fr/2025/01/28/l ... e-en-2024/

Re: Etats-Unis: un grand plan de l'énergie solaire

par energy_isere » 28 janv. 2025, 00:20

BP Solar Farm in Texas Starts Delivery for ExxonMobil Petrochemical Plant

by Jov Onsat|Rigzone Staff | Monday, January 27,

BP PLC has put online a 187-megawatt (MW) solar facility in San Patricio County, Texas, which has been contracted to help power a local petrochemical complex owned by Exxon Mobil Corp. and Saudi Basic Industries Corp.

.............................
https://www.rigzone.com/news/bp_solar_f ... 1-article/

Re: Etats-Unis: un grand plan de l'énergie solaire

par energy_isere » 19 janv. 2025, 12:04

Gros potentiel du solaire flottant aux USA.
Floating photovoltaic (PV) could support US energy goals
January 15, 2025 evwind

Federal reservoirs could help meet the country’s solar energy needs, according to a new study published in Solar Energy.
........................
https://www.evwind.es/2025/01/15/floati ... als/103827

pour le moment il n' y a aucun parc solaire flottant aux USA qui soit plus grand que 10 MW.

Re: Etats-Unis: un grand plan de l'énergie solaire

par energy_isere » 11 janv. 2025, 20:20

suite de ce post du 27 janvier 2024 viewtopic.php?p=2384254#p2384254
EDF Renewables, Enbridge start full operation of 577MW Fox Squirrel Solar project
Located in Madison County, Ohio, the solar project will generate clean energy sufficient to power approximately 118,000 households

Refna Tharayil 7th Jan 2025

EDF Renewables North America and Enbridge have commenced the full operation of the 577MW Fox Squirrel Solar project in the US.

Located in Madison County, Ohio, the solar project was developed in three phases. It is said to be one of the largest utility-scale solar developments east of the Mississippi River.

Currently, all phases of the Fox Squirrel Solar project are actively delivering electricity to the PJM Interconnection grid.

Phase 1, with a capacity of 150MW, became operational in December 2023, while Phase 2, contributing 250MW, came online in July 2024. The final phase, generating 177MW was completed in December 2024.

The Fox Squirrel facility features 1.4 million ground-mounted panels and 159 inverters. The project will generate clean energy sufficient to power approximately 118,000 households.

During its peak construction period, the project employed approximately 650 workers, who installed an average of 10,000 panels daily, contributing nearly 1.5 million work hours.

EDF Renewables North America onshore development senior vice president Kate O’Hair said: “This project is a shining example of the power of partnerships between landowners, the local community and our project partners all working together towards a sustainable future.

“Our development partner, Geenex Solar, has been instrumental in making this project a reality. Fox Squirrel has brought hundreds of jobs and millions of dollars to Madison County throughout the development and construction phase.”

Developed by EDF Renewables and co-owned by Enbridge, the Fox Squirrel Solar project supplies its full generation capacity to Amazon under power purchase agreements. This aligns with Amazon’s climate pledge to achieve net-zero carbon emissions.

The Fox Squirrel project is part of the Geenex Solar development pipeline acquired by EDF Renewables in October 2020. Enbridge joined the project as a 50% partner in November 2023, further expanding its investment in renewable energy initiatives.

In addition, the completion of the Fox Squirrel Solar project is expected to support Ohio’s energy needs while attracting business investment and fostering economic growth in the state.

Enbridge power business development vice president Tom Carbone said: “This project represents an important milestone in advancing Enbridge’s renewable energy strategy, reinforcing our leadership in the ongoing energy evolution.

“We’re proud to provide 100% of the power to Amazon to help provide clean, renewable energy for their operations and support their sustainability goals.”
https://www.nsenergybusiness.com/news/e ... t/?cf-view

Re: Etats-Unis: un grand plan de l'énergie solaire

par energy_isere » 02 janv. 2025, 09:04

Mise en service d'un parc solaire PV de 325 MW dans l'Ohio
Union Solar photovoltaic plant begins operations in Ohio

December 26, 2024 evwind

ACCIONA Energía announced today the achievement of Commercial Operation Date (COD) for its Union Solar Farm in Ohio (325MWp), officially marking the start of energy injection into the Ohio grid.

The project is located in Marysville, central Ohio, and it is comprised of 760,000 solar panels spread over 22 square miles. With a capacity of 325MWp, enough to meet the energy needs of nearly 62,000 households, Union Solar benefits from a long-term power purchase agreement (PPA) with Amazon.

................
https://www.evwind.es/2024/12/26/union- ... hio/103487

Re: Etats-Unis: un grand plan de l'énergie solaire

par energy_isere » 23 déc. 2024, 23:02

Projet d'un parc solaire de 1.3 GW dans le Wisconsin :
Wisconsin approves 1.3 GW Vista Sands solar project
After extensive environmental review, Doral Renewables’ Vista Sands Solar project has been praised as one of the most beneficial and impactful projects in Wisconsin.

December 17, 2024 Anne Fischer
https://www.pv-magazine.com/2024/12/17/ ... wisconsin/

Re: Etats-Unis: un grand plan de l'énergie solaire

par energy_isere » 15 déc. 2024, 18:37

Projet géant en Oregon :
Largest US solar and storage project wins regulatory approval
Sunstone Solar is a 1.2 GW solar, 1.2 GW battery energy storage project planned for eastern Oregon.


December 9, 2024 Ryan Kennedy

Solar developer Pine Gate Renewables announced it has received final discretionary approval from the Oregon Energy Facility Siting Council, marking the final step in an evaluation and public engagement process. The company is now authorized to proceed with SunStone Solar, which would rank as the largest solar project once completed.

The project, located in eastern Oregon, is a proposed 1.2 GW solar and 1.2 GW, 7.2 GWh energy storage facility. For context, the entire state of Oregon has 1.9 GW of cumulative solar installations in its history, according to the Solar Energy Industries Association (SEIA).

Suntone Solar will also entail the construction of an interconnection substation, six collector substations, four operations and maintenance buildings, up to 9.5 miles of 230 kV overhead transmission lines, and other structures including roads, perimeter fencing and gates. The project will interconnect to the Bonneville Power Administration via the Umatilla Electric Cooperative system.

The facility is authorized to occupy up to approximately 9,442 acres of private land zoned for Exclusive Farm Use in Morrow County, Oregon.

“As a lifelong resident of Morrow County, I’m excited for Sunstone Solar to move forward so the local community can benefit from the economic opportunities that the project will bring,” said Ken Grieb, a wheat farmer and landowner in the project. “Pine Gate has demonstrated how large energy facility development can be done thoughtfully and collaboratively.”

Documentation on the approval process and environmental impact studies can be found here.

“Oregon’s energy facility permitting process is one of the most rigorous in the entire country,” said Ben Catt, chief executive officer, Pine Gate Renewables. “The recent unanimous permit approval is a testament to the way our team worked with stakeholders to provide a win-win for Oregon and the Morrow County community.”

Pine Gate said it is in discussion with customers and local utilities to purchase the electricity and associated environmental credits of the project. The company expects the engineering and procurement process to begin in early 2025 with phased construction starting in 2026. Pine Gate Renewables owns and operates 17 other solar projects in Oregon. The company acquired the Sunstone Solar project from Gallatin Power Partners in 2022.

SEIA reports that Oregon sources about 4% of its electricity from solar, enough to power roughly 250,000 homes. About 4,000 people are employed the state’s solar industry.
https://www.pv-magazine.com/2024/12/09/ ... -approval/

Re: Etats-Unis: un grand plan de l'énergie solaire

par energy_isere » 01 déc. 2024, 19:35

2024 : Une année record pour l’énergie solaire aux États-Unis avec 32 GW ajoutés
Les États-Unis s'apprêtent à battre un record d’installations solaires en 2024, avec 32 GW prévus. Les importations massives de panneaux et l’incertitude tarifaire stimulent ce boom historique dans le secteur des énergies renouvelables.

energynews Le 27 novembre 2024

En 2024, l’énergie solaire à l’échelle industrielle aux États-Unis atteindra des sommets inégalés, selon l’American Clean Power Association (ACP). Avec 32,125 gigawatts (GW) d’installations prévues, le pays s’apprête à établir un record historique, soulignant l’importance croissante des énergies renouvelables dans son mix énergétique.

Le contexte de ce développement rapide s’explique en partie par l’expiration imminente du moratoire sur les droits de douane. Ce moratoire, qui prend fin en décembre 2024, a incité les développeurs à accélérer leurs projets afin d’éviter les coûts supplémentaires liés aux tarifs douaniers. Comme l’a noté Sam Huntington, directeur du département énergies nord-américaines chez Commodity Insights : « Les développeurs avancent leurs projets pour respecter les délais du moratoire, ce qui fait de 2024 une année exceptionnelle pour l’énergie solaire. »

Importations massives de panneaux solaires
Le troisième trimestre 2024 a vu une augmentation significative des importations de panneaux solaires, atteignant 15 GW. Parmi les principaux fournisseurs, le Vietnam représente 32,5 % des importations, suivi de la Thaïlande (23 %), de la Malaisie (13,4 %), du Cambodge (11,8 %) et de l’Inde (8,4 %). Cette diversité des sources reflète une dépendance accrue aux marchés asiatiques, qui fournissent des modules à des prix compétitifs.

Les cellules solaires, un composant clé des panneaux, proviennent également de plusieurs pays asiatiques. La Malaisie domine avec 37,3 % des importations, suivie de la Thaïlande (27,6 %) et de la Corée du Sud (19,9 %). Ces importations massives sont indispensables pour répondre à la demande croissante des développeurs américains.

Évolution des coûts et tarifs
Le coût des modules solaires, bien qu’en baisse ces dernières années, pourrait connaître une hausse en 2025 en raison de nouvelles taxes et de l’incertitude politique. Actuellement, les modules Topcon assemblés aux États-Unis sont évalués entre 27 et 30 cents par watt. Ces fluctuations tarifaires, couplées aux modifications potentielles de l’Inflation Reduction Act (IRA) sous une nouvelle administration, ajoutent un niveau de complexité pour les acteurs du marché.

Cependant, les perspectives restent positives à long terme. Selon l’ACP, le coût actualisé de l’électricité (LCOE) pour les centrales solaires devrait passer de 46 $/MWh en 2024 à 38 $/MWh en 2030, grâce à la baisse des coûts du polysilicium et à l’amélioration des facteurs de capacité.

Quelles perspectives après 2024 ?
Malgré l’enthousiasme entourant 2024, le marché devrait connaître un ralentissement en 2025, avec une baisse estimée de 16 % des nouvelles installations. Cette contraction est attribuée à l’effet d’entraînement de l’année record et aux incertitudes politiques. Toutefois, le secteur solaire américain affiche une croissance annuelle moyenne prévue de 6,6 % entre 2025 et 2030.

L’ACP souligne que les défis liés aux politiques tarifaires et aux modifications éventuelles de l’IRA n’empêcheront pas l’énergie solaire de continuer à croître. Les experts estiment que l’énergie solaire restera compétitive, tout en jouant un rôle clé dans la transition énergétique des États-Unis.
https://energynews.pro/2024-une-annee-r ... w-ajoutes/

Re: Etats-Unis: un grand plan de l'énergie solaire

par energy_isere » 19 oct. 2024, 22:07

:shock:
L’ouragan Milton dévaste une ferme solaire en Floride
La centrale photovoltaïque de Duke Energy à Lake Placid a subi une tornade de grade EF-2 sur l’échelle de Fujita lors de l’ouragan Milton, déchiquetant une partie des modules solaires.

octobre 17, 2024 John Fitzgerald Weaver

Image
Le parc solaire Lake Placid en partie dévasté par l'ouragan Milton.
Image : Duke Energy


L’ouragan Milton a traversé l’Etat de la Floride, avec des vents de plus de 200 km/h, causant la mort d’au moins 23 personnes et de très importants dégâts matériels. Le fournisseur d’électricité américain Duke Energy a ainsi diffusé des images montrant les modules solaires arrachés sur une de ses centrales photovoltaïques dans la région. L’installation solaire Lake Placid a été initialement développée par EDF Renewables avant d’être vendue à Duke Energy, qui a achevé le développement et la construction de la centrale en 2019.

La partie solaire de la centrale a une puissance de 45 MWc, soutenue une batterie lithium-ion de 18 MW qui a été ajoutée au site en 2022. Selon des documents publiés en 2019, la ferme solaire a coûté environ 60,6 millions de dollars à construire. Dans la vidéo diffusée par Duke Energy, on voit clairement le tracé de la tornade en diagonale. Le montant des dommages n’a pas été précisé.

Depuis l’ouragan Andrew en 1992, la Floride a constamment renforcé ses normes de vent, mettant en œuvre des innovations au fil des décennies pour rendre les structures plus résistantes aux vents violents. Un changement clé a été l’augmentation des exigences de vitesse du vent pour les nouvelles constructions. La ferme solaire, située dans le comté de Highland, aurait dû être conçue structurellement pour résister à des vitesses de vent allant jusqu’à 150 mph (240 km/h).
.........................
https://www.pv-magazine.fr/2024/10/17/l ... n-floride/

Re: Etats-Unis: un grand plan de l'énergie solaire

par energy_isere » 15 oct. 2024, 01:26

Orsted, SRP Start Up 300 MW Solar, Battery Project in Arizona

by Paul Anderson|Rigzone Staff | Monday, October 14, 2024

Ørsted and Salt River Project (SRP) have started up the Eleven Mile Solar Center, a 300-megawatt (MW) solar project and 300MW/1200MWh battery energy storage system (BESS) in Pinal County.

The project is part of Ørsted’s $20 billion investment in building out American energy generation, the two companies said in a media release. The project represents a $1 billion investment by Ørsted in clean energy in Arizona. For SRP, the Eleven Mile Solar Center is its largest co-located solar and BESS project.

The facility provides power to businesses, homes, and Meta’s data center in Mesa, AZ.
.............................
https://www.rigzone.com/news/wire/orste ... 0-article/

Re: Etats-Unis: un grand plan de l'énergie solaire

par energy_isere » 30 sept. 2024, 12:41

TotalEnergies met en service ses plus grandes centrales solaires avec batteries aux États-Unis

AOF •30/09/2024

TotalEnergies a mis en service Danish Fields et Cottonwood, deux centrales solaires géantes avec stockage par batteries situées dans le sud-est du Texas. Ces nouveaux projets, d’une capacité combinée d’1,2 GW, font partie d’un portefeuille de plus de 4 GW d’actifs renouvelables en opération ou en construction au Texas. Danish Fields est la plus grande centrale solaire de TotalEnergies aux États-Unis, avec une capacité de 720 mégawatts crête (MWc) et 1,4 million de panneaux photovoltaïques.

Danish Fields possède également un système de stockage par batteries de 225 MWh fourni par Saft, la filiale batteries de TotalEnergies.

70% de la capacité solaire de Danish Fields est adossée à des contrats de vente d'électricité à long terme (CPPA) signés avec des acteurs industriels comme Saint-Gobain, avec un mécanisme d'upside sharing indexé sur les prix du marché.

Les 30% restants soutiendront la décarbonisation des sites industriels de TotalEnergies dans la région de la côte du Golfe.

Cottonwood a une capacité de 455 MWc et est constitué de plus de 847 000 panneaux photovoltaïques. Le site intègre également 225 MWh de stockage par batteries fourni par Saft, dont la mise en service est prévue en 2025.

La production d'électricité de Cottonwood est adossée à des contrats CPPA signés à long-terme avec LyondellBasell et Saint-Gobain afin d'accompagner leurs efforts de décarbonation
https://www.boursorama.com/bourse/actua ... bol=1rPTTE

Re: Etats-Unis: un grand plan de l'énergie solaire

par energy_isere » 25 août 2024, 22:43

US deploys 12 GW of utility-scale solar in H1
The US Energy Information Administration (EIA( says 20.2 GW of electricity generation capacity was added in the United States during the first half of 2024. Solar energy led the way, with significant deployments in energy storage as well.

August 20, 2024 Brian Publicover

According to the US Department of Energy’s EIA, the United States connected 20.2 GW (AC) of utility-scale power plants to the grid during the first half of 2024. This capacity includes 12 GW of solar, which represents 59% of the total additions. Energy storage accounted for about 4.2 GW of this new capacity.

Florida and Texas led the nation in utility-scale solar development, contributing 38% of the new solar capacity. Notable projects include the 690 MW Gemini Solar facility in Nevada, which integrates solar and storage, and the 653 MW Lumina Solar Project in Texas.

Energy storage was the second most significant technology by capacity with a total deployment of 4.2 GW. California led the charge, contributing 37% of the total energy storage capacity, followed by Texas (21%), Arizona (19%), and Nevada (13%). Together, these states accounted for 90% of the energy storage capacity added, with the 380 MW battery at the Gemini facility being the largest of the period.

Fossil fuel retirements far outpaced new fossil capacity deployments. The EIA noted that 5.1 GW of capacity was retired, with 53% from methane (2.7 GW) and 41% from coal (2 GW). In contrast, only 0.4 GW of new gas capacity was deployed.

The US energy sector’s growth trajectory is expected to continue its upward trend. For the second half of the year, the EIA forecasts an additional 42.6 GW from new capacity deployments, including 25 GW from solar and an additional 10.8 GW of energy storage. Combined with the first-half capacity of 12 and 4 GW, the nation could finish 2024 with 37 GW of new utility-scale solar and 15 GW of new energy storage facilities.
https://www.pv-magazine.com/2024/08/20/ ... lar-in-h1/