[Electricité] Energie Hydro-électrique

Répondre


Cette question vous permet de vous prémunir contre les soumissions automatisées et intensives effectuées par des robots malveillants.
Émoticônes
:D :geek: :ugeek: :ghost: :wtf: :-D :) :-) :-( :-o :shock: :? 8-) :lol: :-x :-P :oops: :cry: :evil: :twisted: :roll: ;) ;-) :!: :?: :idea: :arrow: :-| :mrgreen: =D> #-o =P~ :^o [-X [-o< 8-[ [-( :-k ](*,) :-" O:) =; :-& :-({|= :-$ :-s \:D/ :-#
Plus d’émoticônes

Le BBCode est activé
La balise [img] est activée
La balise [flash] est activée
La balise [url] est activée
Les émoticônes sont activées

Relecture du sujet
   

Agrandir Relecture du sujet : [Electricité] Energie Hydro-électrique

Re: [Electricité] Energie Hydro-électrique

par energy_isere » 31 août 2024, 16:22

Global hydropower capacity reaches 1412 GW in 2023 amid slowing growth

Staff Writer June 12, 2024

The International Hydropower Association (IHA) has published its latest World Hydropower Outlook, revealing a global increase in hydropower capacity by 13.5GW in 2023, bringing the total to 1,412GW. This includes a 6.5GW rise in pumped storage hydropower, which now totals 182GW. Despite these gains, the five-year rolling average indicates a downward trend, posing a risk to meeting global decarbonization targets by 2050.

Hydropower remains the largest single source of renewable energy, with pumped storage hydropower (PSH) providing more than 90% of the world’s stored energy. However, to meet net zero targets by 2050, hydropower capacity needs to double, necessitating an investment of approximately $3.7 trillion, or $130 billion annually –more than double the current funding levels.

Eddie Rich, CEO of IHA, emphasized the critical role of hydropower in ensuring a reliable energy and water system. “Hydropower is the backbone to a reliable energy and water system. As well as providing electricity, it provides storage, flexibility, reliability to support solar/wind, access to clean water, irrigation, and drought and flood control,” Rich said.

“Whether we like it or not, more droughts and floods due to climate change will mean an increased need to invest in water infrastructure such as dams and reservoirs. Where possible these should be powered.

“This report shows how investments are lagging behind and development has slowed down in the past decade,” Rich continued. “On the positive side, there is a healthier pipeline and pumped storage hydropower is experiencing a renaissance. Its potential to shore up the energy grid is increasingly recognised.”

More hydropower growth needed
The report highlights the need for governments to turn their growing interest in hydropower into actionable projects. To achieve the ‘tripling up’ objective set at COP28, an annual growth rate of 25GW is required until 2030. After that, the rate of hydropower delivery needs to more than double to meet the 2050 net zero target. IHA’s assessment of the “big 100” pipeline of projects suggests that this acceleration is achievable in the early years of the next decade, but sustained action is necessary.

Malcolm Turnbull, IHA President, pointed out the necessity for long-term planning and investment in hydropower to balance the intermittent nature of solar and wind power. ” The more variable power that is developed through solar and wind, the more hydropower will be required to provide balance and flexibility when the wind doesn’t blow, and the sun doesn’t shine,” Turnbull stated. “Governments need to plan for long term energy needs, including a balanced mix of renewable energy, for both generation and long duration storage. Investors need long term certainty for their investment given the high initial capital costs of building large infrastructure projects. Moore’s Law does not apply to digging holes. Hydro projects take time, more than it takes to build solar farms, and so we need to move much faster to deliver the hydropower we need.”

Installed hydropower capacity

In 2023, China, Brazil, the US, Canada, and Russia were the top countries for installed hydropower capacity, with China alone accounting for nearly half of the new capacity. Europe is focusing on modernizing existing hydropower facilities and developing pumped storage to meet its 2030 renewable energy targets. In Africa, hydropower already provides 40% of sub-Saharan Africa’s electricity, though 90% of its potential remains untapped. South America relies on hydropower for 45% of its electricity, with over 13GW of new projects in the pipeline. In Central America, hydropower accounts for over 30% of electricity, and the US has significant potential for modernization, with about half of its non-federal hydropower fleet up for relicensing by 2035.

The IHA’s report underscores the importance of hydropower in achieving global renewable energy goals and the urgent need for increased investment and faster project delivery. The findings call for coordinated efforts from governments and investors to ensure hydropower can meet the growing demands of a decarbonizing world.
https://www.waterpowermagazine.com/news ... &cf-closed

Re: [Electricité] Energie Hydro-électrique

par energy_isere » 21 avr. 2024, 11:21

Re: [Electricité] Energie Hydro-électrique

par energy_isere » 27 janv. 2023, 01:25

Silenius a écrit :
26 janv. 2023, 23:42
Tunnelage pour une nouvelle conduite forcee sous le lac de Ritom dans le Tessin, pour alimenter en electricite les chemins de fer Suisses. (STEP)
Il s'agit de reconstruire complétement la centrale hydraulique en bas, et de remplacer les conduites forcée en surface par un tunnel souterrain.
Les installations dataient de 1920. Les travaux coutent 250 millions de francs suisses. (actuellement parité entre euro et Francs suisse)

https://impeller.net/magazin/old-agains ... or-future/
The four Pelton turbines with a total rated output of 44 MW that are used in the Ritom pumped storage power plant will be replaced by much more powerful generating units in the new facility. To this end, Voith will supply two Pelton 60 MW turbines and a 60 MW storage pump.

The different designs and purposes of the generating units mean that Voith’s engineers have exacting requirements to meet. For example, the first machine unit will supply power for the 16.7 Hz Swiss Rail network and the operation of its trains. The second will feed the electricity it generates into the 50 Hz public grid.

The third unit, a 60 MW capacity storage pump with a delivery head of more than 700 m, will pump the water for reservoir management and to provide balancing power (operating reserve) from the Airolo basin to Lake Ritom.

Re: [Electricité] Energie Hydro-électrique

par energy_isere » 27 janv. 2023, 00:33

En effet de la grosse mécanique de science fiction. :-o

Image

Re: [Electricité] Energie Hydro-électrique

par Silenius » 26 janv. 2023, 23:42

Tunnelage pour une nouvelle conduite forcee sous le lac de Ritom dans le Tessin, pour alimenter en electricite les chemins de fer Suisses. (STEP)
Assez impressionnant : https://www.youtube.com/watch?v=6AV2NcyX7pk

Re: [Electricité] Energie Hydro-électrique

par energy_isere » 07 nov. 2022, 00:10

Le barrage Hoover : tous les secrets de cette merveille d'ingénierie
Video 9 mn https://www.youtube.com/watch?v=xNYdzLIBlEM

Lesics français
264 k abonnés
578 757 vues 4 mai 2022
Le magnifique barrage Hoover , construit il y a 80 ans, est toujours aussi solide et contribue à l'irrigation, au contrôle des inondations et à la production d'électricité aux États-Unis. Même lors d'une pluie torrentielle, on ne verra pas le barrage Hoover déborder et causant des destructions. Découvrez les secrets d'ingénierie du barrage Hoover. Dans cette vidéo, vous allez endosser le rôle de l'ingénieur concepteur du barrage Hoover , M. John Savage, et concevoir et construire un barrage gigantesque sur le fleuve Colorado en Arizona.


Image

Re: [Electricité] Energie Hydro-électrique

par energy_isere » 13 juil. 2020, 00:19

The global hydropower installed capacity is 1,150 GW

July 7, 2020 evwind

The global hydropower market, as measured in annual capacity installations, contracted in 2018, continuing a multi-year trend of deceleration. New capacity was an estimated 15.6 GW, raising total global installed capacity to around 1,150 GW. The ranking of the top 10 countries for total capacity shifts only over long time frames and remained (in order) China, Brazil, Canada, the United States, the Russian Federation, India, Norway, Turkey, Japan and France, which together represented more than two-thirds of global capacity at year’s end.

Image

Hydropower generation around the world varies from year to year, affected not only by changes in installed capacity but even more by shifts in weather patterns and other local operating conditions. In 2019, global generation was an estimated 4,306 TWh, an increase of 2.3% from 2018, or around 15.9% of the world’s total electricity generation.

......
https://www.evwind.es/2020/07/07/the-gl ... 0-gw/75616

Re: Energie Hydro-électrique

par energy_isere » 21 nov. 2017, 19:42

Le duché de Lancaster signe pour une usine marémotrice

Publié le 21/11/2017

Le duché de Lancaster vient de donner son accord à la société écossaise Atlantis resources et au codeveloppeur Natural energy wire (New), pour un bail à long terme visant à construire un barrage à énergie marémotrice de 160 MW près de Fleetwood, dans le nord-ouest de l'Angleterre.

Image

Les appels d'offres pour ce projet d'usine marémotrice seront lancés en début d'année 2018. (Image : Natural energy wire)
http://www.lemarin.fr/secteurs-activite ... s-resurces

Ce projet fait les 2/3 de la puissance de celle de La Rance en France.

Re: [Electricité] Energie Hydro-électrique

par energy_isere » 13 juil. 2015, 10:27

Le Panama embarrassé par le conflit sur le barrage de Barro Blanco

09 Juillet 2015

A l’approche de la conférence sur le climat, la COP21, en décembre à Paris, le Panama est embarrassé par le conflit provoqué par le barrage de Barro Blanco. Les constructeurs et les financeurs prétendent bénéficier du mécanisme de développement propre des Nations unies. Or, depuis quatre ans, ce projet oppose les indigènes Ngöbe-Buglé à l’entreprise hondurienne Genisa et à deux banques européennes, une allemande (DEG) et l’autre hollandaise (FMO).

Le chantier est occupé depuis la mi-juin par les Indiens. Face à l’impasse, le président panaméen, Juan Carlos Varela, s’est rendu personnellement dans la région, le 2 juillet, pour tenter de renouer le dialogue.Plusieurs ministres avaient essayé une médiation, sans succès. « Le gouvernement actuel semble être de bonne foi, il cherche une solution pacifique mais il est soumis à des pressions contraires, locales et internationales », affirme Pierre-Jean Brasier, coordinateur de Carbon Market Watch, une ONG qui passe au crible les marchés carbone et milite pour des politiques climatiques responsables.

Cadeau empoisonné

L’affaire remonte à la présidence de Ricardo Martinelli (2009-2014), dont plusieurs proches collaborateurs sont en prison pour corruption. M. Martinelli a laissé en héritage un cadeau empoisonné : la construction du barrage de Barro Blanco, sur la rivière Tabasara, un fleuve sacré pour les communautés Ngöbe-Buglé. Le projet viendrait enrichir les ressources hydroélectriques de la province de Chiriqui, dans le nord du pays.

...............
http://america-latina.blog.lemonde.fr/2 ... ro-blanco/

Re: [Electricité] Energie Hydro-électrique

par sceptique » 31 juil. 2014, 11:47

Sur la légende de la photo : 615 M€ pour 500 000 m3 de béton
Cela fait ~ 1200 € le m3 coulé (avec le ferraillage, les soubassements ancrages etc ...). Pas très cher !

Re: Energie Hydro-électrique

par energy_isere » 31 juil. 2014, 09:34

Barrage d' Ermenek en Turquie (Sud du pays).

Barrage voute construit entre 2002 et 2009. 210 m de haut.
Centrale electrique de 300 MW.
The Ermenek Dam is a double-curvature concrete arch dam located on the Göksu River in Karaman Province, Turkey. The 210 m (689 ft) tall dam (218 m (715 ft) from thalweg level) was the highest in Turkey at the time of its construction and currently ranks third after Deriner Dam and Yusufeli Dam (under construction). The development was backed by the Turkish State Hydraulic Works. Completed in 2009, the primary purpose of the dam is to support its 300 MW power station
http://en.wikipedia.org/wiki/Ermenek_Dam

La photo avec la voute en construction provient de Capital de ce mois ci (Aout).

Re: Energie Hydro-électrique

par energy_isere » 11 juin 2014, 21:07

Finlande : Gain de puissance pour la centrale hydroélectrique Harjavalta (enerzine)

Les deux de alternateurs avaient été construits en 1939 et 1940 !
Costaud ces bétes la.

Re: Energie Hydro-électrique

par energy_isere » 25 févr. 2014, 11:10

Projet de centrale hydroélectrique de Shuakhevi en Géorgie

25 fev 2014 enerzine

Le consortium mené par Alstom* a obtenu un contrat d'une valeur de près de 30 millions d'euros portant sur la fourniture d'équipements destinés au projet de la centrale hydroélectrique de Shuakhevi, en Géorgie.

Ce projet s'inscrit dans le cadre de l'un des plus importants programmes d'investissements directs étrangers jamais menés en Géorgie à ce jour. Son objectif est d'assurer la fourniture à la Géorgie et à la Turquie d'une énergie renouvelable propre permettant de contribuer à répondre au pic de demande d'électricité en hiver. La centrale électrique, dont la mise en service est prévue pour 2016, affichera une capacité installée de 178,6 MW.

Le périmètre contractuel d'Alstom inclut la fourniture et l'installation d'équipements électromécaniques comprenant 2 turbines Francis verticales d'environ 89.3 MW (chacune fonctionnant à une vitesse de 600 RPM, et à une hauteur de chute nominale de 396.2m), leurs régulateurs, leurs vannes d'admission principales de type sphérique, 2 générateurs triphasés à arbre vertical à pôles saillants, 2 transformateurs élévateurs triphasés, un poste de commutation extérieur 220 kV à isolation gazeuse, un pont roulant électrique ainsi que l'ensemble des équipements mécaniques et électriques auxiliaires de l'installation.

..................
en entier : http://www.enerzine.com/7/16966+projet- ... rgie+.html

Re: Energie Hydro-électrique

par energy_isere » 28 janv. 2014, 19:52

La banque mondiale va participer à hauteur de 80 % au financement de la réhabilitation du parc de barrages en Inde.

Egis remporte un contrat pour un projet visant à réhabiliter 223 barrages en Inde

Re: Energie Hydro-électrique

par energy_isere » 24 nov. 2013, 13:31

30 GW de capacité hydraulique ajoutée au niveau mondial en 2012.

Dont 51% de ce chiffre pour la seule Chine.
Voir ci dessous le détail de leur 4 plus gros projets hydrau en cours.
China continues its dominance of the global hydropower market

18/11/2013 Evwind,

ITH 30GW of new capacity installed during 2012, global cumulative hydropower capacity jumped to 1127GW by the year-end, providing an estimated 3524TWh of electricity generation annually.

Thus, this technology is still by far the one with the highest cumulated installed capacity among renewable energy sources.
...............

Just over half (51%) of the hydro capacity installed in 2012 was in China, converting this market into the most active for the year. With the largest installed capacity in the world also, accounting 240.7GW of total capacity, the country is continuing its expansion and currently has 61GW under construction.

The most notable Chinese projects underway are:

- Baihetan (13.1GW), which will be the third largest dam in China when completed and the fourth largest in the world. It is slated for completion in 2019;

- Wudongde and Xiangjiaba (8.7 and 6.4GW, respectively) are located in Jinsha River. Both are scheduled to be finished in 2015; and

- Xiluodu (14GW) located in Yangtze River. This project was temporarily stopped by the Chinese government in 2005 due to lack of environmental impact studies, but construction is again underway.


Meantime after the controversies regarding the location of the Belo Monte hydroelectric power plant in the Amazonas Area, Brazil is surging ahead once again also. Based on projects underway, it will account for 11GW of new capacity in 2015.

..................
http://www.evwind.es/2013/11/18/china-c ... rket/38079