par energy_isere » 16 juin 2024, 14:53
suite de ce post du 8 octobre 2023
http://www.oleocene.org/phpBB3/viewtopi ... 9#p2377969
Mauvaise passe pour cette nouvelle mine de cuivre aux USA :
Nevada Copper files for bankruptcy, CEO steps down
By: Mariaan Webb 10th June 2024
US copper miner Nevada Copper on Monday announced that it had filed for bankruptcy protection under Chapter 11 of the US Bankruptcy Code.
The company, which owns the Pumpkin Hollow mine, will not continue operations during the restructuring period.
..................................
https://www.miningweekly.com/article/ne ... 2024-06-10
-
energy_isere
- Modérateur

- Messages : 97852
- Inscription : 24 avr. 2005, 21:26
- Localisation : Les JO de 68, c'était la
-
Contact :
Message
par energy_isere » 23 juin 2024, 11:10
Ecuador to approve Mirador copper mine expansion by August — official
Cecilia Jamasmie | June 20, 2024
The government of Ecuador is in the final steps of approving an expansion for the Mirador copper mine, run by the local unit of Chinese consortium CRCC-Tongguan, EcuaCorriente.
Diego Ocampo, vice minister of mines, told BNamericas his office was finishing reviewing the project’s documentation, adding he hoped to be signing off on the expansion in about four weeks, or by August at the latest.
The authority noted the finance ministry’s fiscal sustainability opinion is pending, but no issues were expected. “The importance of the Mirador expansion is very clear,” Ocampo said.
Mirador, in the southeastern Zamora-Chinchipe province, has reserves estimated at 3.2 million tonnes of copper and is one of the only two mines in Ecuador that are in operations. The other is Lundin Gold’s (TSX: LUG) Fruta del Norte gold mine.
The extension, also dubbed Phase II, seeks to boost ore production at the Mirador South deposit from 60,000 tonnes per day (20 million tpa) to 80,000 t/d (26.2 Mtpa). It also includes developing the Mirador North deposit, with an expected output of 60,000 t/d and an estimated investment of $653 million.
After the extension, the company anticipates the total production scale of the Mirador Phase II project would be 140,000 t/d (46.2 million t/y), of which 80,000 t/d (26.4 million t/y) will come from the southern pit and 60,000 t/d (19.8 million t/y) from the northern section.
Mirador has an expected operative mine of 16.9 years — 20 years for the current south pit and about 16 for the northern one.
Last year, EcuaCorriente completed designs for the pit, waste dump, plant, access routes, water collection dams for the pit and waste dump, sedimentation pools, and the conveyor belt.
........................
https://www.mining.com/ecuador-to-appro ... -official/
-
energy_isere
- Modérateur

- Messages : 97852
- Inscription : 24 avr. 2005, 21:26
- Localisation : Les JO de 68, c'était la
-
Contact :
Message
par energy_isere » 28 juin 2024, 00:23
Bravo Derichebourg !
Inauguration d'une ligne de recyclage de câbles en cuivre dans le Nord
AFP le 25 juin 2024
Derichebourg, spécialiste des services à l'environnement et notamment du recyclage des métaux, a inauguré mardi une nouvelle ligne de recyclage de câbles en cuivre à Escautpont (Nord) avec une capacité de traiter 20 000 tonnes de câbles par an.
Des câbles broyés pour récupérer le cuivre
Cette plateforme de recyclage, qui a bénéficié d'un investissement de 18 millions d'euros et qui emploie 18 personnes, produit du cuivre sous forme de grenaille pour l'industrie à partir de câbles électriques.
La ligne de production industrielle, constituée notamment de broyeur, granulateurs et tables densimétriques, permet de broyer les câbles pour séparer le cuivre du plastique.
La grenaille "sera revendue directement aux fonderies" qui refont "des bobines de cuivre et ça repart dans l'industrie", explique à l'AFP Thomas Derichebourg, directeur général de l'entreprise.
Au vu du prix du cuivre actuellement, "il est impensable de laisser partir des microgrammes de cuivre", estime-t-il. "Le cuivre, se raréfie, il faut le recycler, il faut le collecter et le réinjecter dans l'industrie", martèle-t-il, ajoutant que cette chaîne, en fonction depuis octobre, tourne de 8h à 20h.
Les câbles recyclés proviennent de la démolition de bâtiments, des véhicules hors d'usage ou encore des réseaux numériques et de télécommunication.
Une demande européenne qui pourrait être multipliée par 6 d'ici 2030
Pour cette nouvelle plateforme de recyclage, Derichebourg s'est appuyée sur les méthodes et technologies de sa première installation similaire installée à Saint-Marcel (Saône-et-Loire) depuis mars 2020, qui possède également la capacité de traiter 20 000 tonnes de câbles de cuivre par an.
En Europe, continent dépourvu de ressources naturelles en cuivre, la demande pour ce métal devrait être multipliée par six d'ici 2030, prédit un rapport de l'ONU publié en octobre 2023. Le manque de cuivre est préoccupant pour la transition énergétique, tant le métal rouge est central pour l'électrification des usages, levier majeur de réduction des gaz à effet de serre.
Faute de tissu industriel "favorable" en France, des métaux usagés sont exportés pour être traités souvent dans des pays frontaliers, a déploré l'Ademe en mars, appelant à conserver les gisements de déchets en France, pour répondre à l'augmentation de la demande en métaux recyclés.
https://www.connaissancedesenergies.org ... ord-240625
-
Jeuf
- Hydrogène

- Messages : 3697
- Inscription : 01 janv. 2005, 18:08
- Localisation : Poitou
Message
par Jeuf » 28 juin 2024, 12:46
Il était temps de s'y mettre.
Et le plastique des cables, ils en font quoi?
On nous dit de trier dans les poubelles, ce à quoi je ne crois pas trop et ne fais pas trop.
là il y a un gisement avec certainement pas trop de diversité de matières plastiques, et ce n'est pas un sujet...
-
energy_isere
- Modérateur

- Messages : 97852
- Inscription : 24 avr. 2005, 21:26
- Localisation : Les JO de 68, c'était la
-
Contact :
Message
par energy_isere » 29 juin 2024, 10:09
suite de ce post du 15 juin 2024
http://www.oleocene.org/phpBB3/viewtopi ... 5#p2392835
RDC : Africa Finance Corporation investit 150 millions $ dans Kamoa-Kakula
Agence Ecofin 27 juin 2024
Le prêt servira à financer la troisième phase d’expansion du complexe cuprifère, qui permettra de porter sa capacité de production à plus de 600 000 tonnes de minerai par an.
Africa Finance Corporation (AFC) a annoncé, dans un communiqué publié le mercredi 26 juin 2024, l’octroi d’un prêt de 150 millions de dollars à la compagnie minière Kamoa Copper pour financer l'expansion du complexe crucifère de Kamoa-Kakula en République démocratique du Congo.
Ce prêt est aligné sur l'engagement de la société à soutenir la valorisation locale des abondantes ressources minérales de l'Afrique dans le but de débloquer la prospérité économique du continent, a-t-on précisé de même source.
Kamoa Copper, l'opérateur du complexe, est une coentreprise entre la société minière canadienne Ivanhoe Mines (39,6%), la compagnie chinoise Zijin Mining Group (39,6%), la société privée basée à Hong Kong Crystal River Global Limited (0,8%) et le gouvernement congolais (20 %).
Kamoa-Kakula est la plus grande mine de cuivre en Afrique. Située à l'extrémité ouest de la prolifique ceinture de cuivre d'Afrique centrale, cette mine est entrée en production en juillet 2021. Elle fait actuellement l'objet d'une troisième phase d'expansion, qui permettra d’augmenter sa capacité de production de 33 % à plus de 600 000 tonnes par an.
La troisième phase de développement de la mine prévoit également la construction de la plus grande fonderie de cuivre d'Afrique, avec une capacité de 500 000 tonnes par an d'anodes de cuivre pur à 99 %, et la production de 178 mégawatts (MW) d’électricité grâce à la remise en état de la turbine n° 5 du barrage hydroélectrique d'Inga II.
Cette phase, qui devrait être achevée d'ici fin 2024, fera de Kamoa-Kakula la troisième plus grande mine de cuivre à l’échelle mondiale.
« C’est une étape clé dans notre mission de développement d'écosystèmes d'infrastructures qui contribuent à l'intégration des économies et à la transformation économique en Afrique », a déclaré le PDG d’AFC, Samaila Zubairu, cité dans le communiqué. Et d’ajouter : « Le cuivre est l'un des minéraux essentiels à la transition énergétique mondiale, et l'expansion de cette mine permettra non seulement de consolider la position de l'Afrique sur le marché mondial du cuivre, mais aussi de contribuer à la trajectoire du continent vers la neutralité carbone, tout en créant des opportunités d'emploi et en générant des revenus importants pour la RDC ».
La mine de Kamoa-Kakula a contribué à hauteur de 4 % du produit intérieur brut (PIB) de la RDC en 2023, selon l’AFC.
https://www.agenceecofin.com/mines/2706 ... moa-kakula
-
energy_isere
- Modérateur

- Messages : 97852
- Inscription : 24 avr. 2005, 21:26
- Localisation : Les JO de 68, c'était la
-
Contact :
Message
par energy_isere » 30 juin 2024, 10:22
Freeport Indonesia opens $3.7bn copper smelter in Gresik
The smelter is expected to meet the surging demand for copper, which is essential for renewable energy technologies.
June 27, 2024
Copper mining company Freeport Indonesia has commissioned its $3.7bn Gresik copper smelter in East Java, reported Reuters.
The smelter is expected to meet the surging demand for copper essential for renewable energy technologies.
Freeport Indonesia CEO Tony Wenas said the facility is expected to produce around 650,000 tonnes (t) of copper cathode and 50–60t of gold.
Expected to commence operations at half capacity by August 2024, the facility has an input capacity of 1.7 million tonnes of copper concentrate.
The Gresik copper smelter is expected to achieve full capacity by December this year.
This development aligns with Indonesia’s policy to ban the export of all raw minerals from June 2023, although Freeport Indonesia and Amman Mineral Internasional have been granted an extension until 31 May 2024, to complete their smelters.
Wenas said: “Copper going forward will be very much needed by the world. Countries are racing to transition their energy sources to renewables and sustainable sources. This will need a lot of copper.”
Both Freeport Indonesia and its rival have sought to extend their export permits until the end of 2024 to continue shipping copper concentrate while their smelters ramp up to full operation.
In April 2023, Reuters reported that Indonesia’s Minister of Investment, Bahlil Lahadalia, said that Freeport Indonesia was required to sell an additional 10% stake to the government.
The announcement comes as the company, which is a subsidiary of US-based Freeport-McMoRan, started talks with the government over a permit extension to operate in the country.
https://www.mining-technology.com/news/ ... r/?cf-view
Gresik copper smelter and refinery is located 30 kilometers north of the city of Surabaya, East Java major port. Credit: Mitsubishi Materials
https://www.mining.com/web/freeport-ind ... es-demand/
-
energy_isere
- Modérateur

- Messages : 97852
- Inscription : 24 avr. 2005, 21:26
- Localisation : Les JO de 68, c'était la
-
Contact :
Message
par energy_isere » 30 juin 2024, 10:26
Capstone produces first copper concentrate at MVDP project in Chile
This milestone marks significant progress as the mine advances commissioning and moves towards the production stage.
June 26, 2024
apstone Copper has produced the first saleable copper concentrate at its Mantoverde Development Project (MVDP) in Chile.
This milestone marks significant progress as the mine advances commissioning and moves towards full production levels.
The company noted that the MVDP is on track to increase its copper output from around 35,000 tonnes (t) in 2022 to an estimated 120,000t in the second half of 2024.
A new concentrator plant at MVDP is designed to process sulphide ores, with an annual capacity of 12.3 million tonnes (mt) per year.
This development complements the existing SX-EW plant, which continues to treat oxide ores.
The mine utilises conventional open-pit operations with truck-and-shovel technology.
The construction of the concentrator was completed in late 2023 under a lump-sum turnkey engineering, procurement and construction contract with Ausenco. The total capital costs for MVDP are estimated at $870m (C$1.19bn).
Capstone noted that the first ore to the primary crusher was completed in Q4 2023 and the first ore to the grinding circuit occurred in Q1 2024.
The company anticipates reaching nameplate operating rates during Q3 2024. The MVDP is expected to process 236mt of copper sulphide reserves over a 20-year mine life, in addition to the existing oxide reserves.
The addition of a sulphide concentrator, capable of processing 32,000 ore tonnes per day (tpd), and a tailings storage facility are significant enhancements to the facility.
Capstone has also identified that the desalination plant capacity and major components of the comminution and flotation circuits can sustain an average annual throughput of up to 45,000tpd without major capital equipment upgrades.
Capstone and Ausenco’s engineering team are developing the Optimised Mantoverde Development Project (MVDP Optimised).
Looking ahead, Mantoverde Phase II will explore the addition of a second processing line to utilise the additional 77% of resources not currently processed by the MVDP Optimised project.
Capstone CEO John MacKenzie said: “First saleable copper concentrate production at MVDP is a significant milestone for Capstone.
“This achievement is a testament to our dedicated and skilled teams, who continue to work towards a safe and efficient ramp-up to nameplate operating rates. MVDP remains on track and on budget with our guidance previously disclosed.
“In July, we plan to release an updated feasibility study for our Santo Domingo project, followed by a feasibility study for our Mantoverde Optimised project later in the quarter, which will define the next phases of our value-accretive production growth in the district.”
https://www.mining-technology.com/news/ ... r/?cf-view
sur le site du minier :
https://capstonecopper.com/operations/mantoverde/
https://im-mining.com/2023/12/21/capsto ... t-project/
-
energy_isere
- Modérateur

- Messages : 97852
- Inscription : 24 avr. 2005, 21:26
- Localisation : Les JO de 68, c'était la
-
Contact :
Message
par energy_isere » 30 juin 2024, 10:43
suite de ce post du 24 février 2024
http://www.oleocene.org/phpBB3/viewtopi ... 3#p2386363
Court approves billionaire Agarwal’s plan to reclaim Zambia mine
Bloomberg News | June 29, 2024
Vedanta Resources Ltd. can take back control of the Konkola copper project in Zambia after a court sanctioned a plan to settle debts owed to the mine’s creditors.
A court in Zambia’s capital, Lusaka, on Friday approved a scheme of arrangement that was supported by Konkola Copper Mines Plc’s creditors, the southern African country’s mines minister, Paul Kabuswe, said on Facebook.
Billionaire Anil Agarwal’s Vedanta has been trying to regain the major copper asset since 2019, when KCM was put into provisional liquidation after the previous government accused its owner of lying about expansion plans and paying too little tax.
To get access to the mine again, Vedanta now needs to follow the court ruling by releasing $250 million to settle debts that KCM owes to contractors and suppliers. Vedanta told Bloomberg this week that it stands ready to start making the payments. Agarwal’s firm has also committed to investing $1 billion over five years to complete expansion projects.
Although Konkola’s annual production capacity exceeds 300,000 tons of copper, output of the metal that’s key to the energy transition and whose price rallied to a record last month slumped to less than 40,000 tons in 2023.
The flagship operation — Konkola Deep — extends almost a mile underground. It is one of the world’s wettest mines, requiring the equivalent of 140 Olympic-sized swimming pools to be pumped to the surface daily in order to function.
https://www.mining.com/web/court-approv ... mbia-mine/
-
energy_isere
- Modérateur

- Messages : 97852
- Inscription : 24 avr. 2005, 21:26
- Localisation : Les JO de 68, c'était la
-
Contact :
Message
par energy_isere » 30 juin 2024, 10:53
Gros investissements prévus dans le cuivre en Uzbekistan :
Uzbek copper producer will spend $15 billion to more than double output
Reuters | June 27, 2024
Uzbekistan’s Almalyk Mining and Metals Combine (AGMK) plans a $15 billion expansion programme to increase copper cathode output to 400,000 metric tons a year by 2030 from 148,000 tons currently, it said on Thursday.
Prices for copper, used in the power and construction industries, hit a record high of $11,104.5 on May 20 on speculative buying and concerns that rising demand from the energy transition would tighten the market in future.
AGMK’s plans includes boosting both mining and ore processing facilities and the construction of a new smelter, the state-controlled company said. The plan is part of an expansion program approved by the government in 2020.
The copper, zinc, silver and gold producer said it would borrow most of the required funds from local and foreign banks and also receive $1 billion from a state development fund.
AGMK signed a deal last year with Germany’s KfW IPEX-Bank to arrange $2.55 billion in loans.
The global copper market faces a surplus of 162,000 tons this year with refined copper production of 27.3 million tons, according to the International Copper Study Group.
https://www.mining.com/web/uzbek-copper ... le-output/
-
energy_isere
- Modérateur

- Messages : 97852
- Inscription : 24 avr. 2005, 21:26
- Localisation : Les JO de 68, c'était la
-
Contact :
Message
par energy_isere » 02 juil. 2024, 20:29
Bravo Derichebourg ! (update avec la photo plus bas)
Inauguration d'une ligne de recyclage de câbles en cuivre dans le Nord
AFP le 25 juin 2024
Derichebourg, spécialiste des services à l'environnement et notamment du recyclage des métaux, a inauguré mardi une nouvelle ligne de recyclage de câbles en cuivre à Escautpont (Nord) avec une capacité de traiter 20 000 tonnes de câbles par an.
Des câbles broyés pour récupérer le cuivre
Cette plateforme de recyclage, qui a bénéficié d'un investissement de 18 millions d'euros et qui emploie 18 personnes, produit du cuivre sous forme de grenaille pour l'industrie à partir de câbles électriques.
La ligne de production industrielle, constituée notamment de broyeur, granulateurs et tables densimétriques, permet de broyer les câbles pour séparer le cuivre du plastique.
La grenaille "sera revendue directement aux fonderies" qui refont "des bobines de cuivre et ça repart dans l'industrie", explique à l'AFP Thomas Derichebourg, directeur général de l'entreprise.
Au vu du prix du cuivre actuellement, "il est impensable de laisser partir des microgrammes de cuivre", estime-t-il. "Le cuivre, se raréfie, il faut le recycler, il faut le collecter et le réinjecter dans l'industrie", martèle-t-il, ajoutant que cette chaîne, en fonction depuis octobre, tourne de 8h à 20h.
Les câbles recyclés proviennent de la démolition de bâtiments, des véhicules hors d'usage ou encore des réseaux numériques et de télécommunication.
Une demande européenne qui pourrait être multipliée par 6 d'ici 2030
Pour cette nouvelle plateforme de recyclage, Derichebourg s'est appuyée sur les méthodes et technologies de sa première installation similaire installée à Saint-Marcel (Saône-et-Loire) depuis mars 2020, qui possède également la capacité de traiter 20 000 tonnes de câbles de cuivre par an.
En Europe, continent dépourvu de ressources naturelles en cuivre, la demande pour ce métal devrait être multipliée par six d'ici 2030, prédit un rapport de l'ONU publié en octobre 2023. Le manque de cuivre est préoccupant pour la transition énergétique, tant le métal rouge est central pour l'électrification des usages, levier majeur de réduction des gaz à effet de serre.
Faute de tissu industriel "favorable" en France, des métaux usagés sont exportés pour être traités souvent dans des pays frontaliers, a déploré l'Ademe en mars, appelant à conserver les gisements de déchets en France, pour répondre à l'augmentation de la demande en métaux recyclés.
https://www.connaissancedesenergies.org ... ord-240625
Photo dans Usine Nouvelle
Derichebourg Environnement a inauguré le 25 juin son usine de recyclage de câbles à Escautpont, près de Valenciennes, dans le Nord. 18 millions d’euros ont été investis, notamment pour équiper la ligne de production de dernières technologies de tri.
La nouvelle infrastructure de Derichebourg Environnement à Escautpont peut traiter 20 000 tonnes de câbles annuellement.
Après une première usine de recyclage de câbles implantée en Bourgogne-France-Comté (à Saint-Marcel), Derichebourg Environnement installe une nouvelle usine, dans le Nord cette fois, à Escautpont. «Il s’agit d’une position stratégique, car nous sommes à proximité des plus gros affineurs qui sont en Belgique et en Allemagne. De plus, nous sommes au bord d’une voie d’eau. On pourra facilement acheminer des câbles par péniche si le prix du transport est intéressant et si le projet Canal Seine-Nord-Europe se développe bien», indique Gaston Desclozeaux, responsable technique du site.
https://www.usinenouvelle.com/article/d ... d.N2215315
-
energy_isere
- Modérateur

- Messages : 97852
- Inscription : 24 avr. 2005, 21:26
- Localisation : Les JO de 68, c'était la
-
Contact :
Message
par energy_isere » 06 juil. 2024, 11:54
suite de ce post du 30 juin 2024
http://www.oleocene.org/phpBB3/viewtopi ... 4#p2393944
Cuivre : la société émiratie IRH renonce aux actifs de Vedanta en Zambie
Agence Ecofin 04 juillet 2024
Pour étendre son empreinte sur le cuivre en Zambie, la société émiratie International Resources Holdings (IRH) ciblait les actifs de Vedanta dans le pays. Au bout de plusieurs mois de négociations, les deux parties n’ont pu se mettre d’accord sur le prix de la transaction envisagée.
En Zambie, International Resources Holdings (IRH) a annoncé se retirer de la course pour le rachat d’une participation dans les mines de cuivre de Vedanta. La société émiratie explique notamment cette décision par le prix jugé élevé réclamé par le groupe du milliardaire indien Anil Agarwal.
« IRH a mis fin aux discussions sur la transaction il y a deux mois en raison de divergences dans l’évaluation », a déclaré la compagnie émiratie dans un courrier électronique cité par Reuters. IRH a en effet proposé environ un milliard de dollars pour acquérir 51 % d’intérêts dans Konkola Copper Mines (KCM).
Vedanta réclamait de son côté près du double du montant proposé, pour vendre environ 30 % de ses intérêts dans KCM. Notons que Vedanta contrôle 80 % de la société, après avoir réglé en 2023 un différend de plusieurs années avec le gouvernement zambien qui avait saisi en 2019 les actifs en question.
Pour le groupe du milliardaire indien Anil Agarwal, la vente d’une partie de sa participation dans KCM a pour but de mobiliser des fonds pour relancer les opérations. L’objectif affiché est notamment de quadrupler la production annuelle du complexe minier à 300 000 tonnes. Ce plan s’inscrit dans la stratégie du gouvernement zambien qui compte sur Konkola pour produire plus d’un million de tonnes de cuivre d’ici 2026, contre environ 700 000 tonnes en 2023.
https://www.agenceecofin.com/cuivre/040 ... -en-zambie
-
energy_isere
- Modérateur

- Messages : 97852
- Inscription : 24 avr. 2005, 21:26
- Localisation : Les JO de 68, c'était la
-
Contact :
Message
par energy_isere » 07 juil. 2024, 11:10
suite de ce post du 31 mars 2024
http://www.oleocene.org/phpBB3/viewtopi ... 6#p2389046
Amman Mineral seeks up to $1.5 billion loan for mine expansion
Bloomberg News | July 5, 2024
Image courtesy of PT Amman Mineral
Indonesian miner PT Amman Mineral Internasional is seeking up to $1.5 billion in a loan to expand the country’s second-largest copper and gold mine, according to people familiar with the matter.
The Jakarta-based company has obtained commitments from several banks, including state-owned PT Bank Mandiri and PT Bank Negara Indonesia, for the loan, with proceeds to be spent on its Batu Hijau mine, according to the people, who declined to be identified because the discussion is private.
https://www.mining.com/web/amman-minera ... expansion/
-
energy_isere
- Modérateur

- Messages : 97852
- Inscription : 24 avr. 2005, 21:26
- Localisation : Les JO de 68, c'était la
-
Contact :
Message
par energy_isere » 07 juil. 2024, 11:30
suite de ce post du 24 mars 2024 :
http://www.oleocene.org/phpBB3/viewtopi ... 6#p2388636
Les travaux d'agrandissement de la mine de Cuivre-Or de Centinela au Chili avancent.
Antofagasta Minerals making steady progress on US$4.4bn Centinela copper project
Published: Tuesday, July 02, 2024
With blasting at the site where Minera Centinela's second concentrator plant will be located, Chile’s Antofagasta Minerals (AMSA) achieved a milestone in its US$4.4bn project that will add 144,000t/y copper production from 2027.
The blasting in the Sierra Gorda district of Antofagasta region was carried out to prepare the land and install the support infrastructure for the concentrator that will have capacity of 95,000t/d.
The project is expected to produce 170,000t/y of copper equivalent, including 130,000oz/y of gold and 3,500t/y of molybdenum during the first 10 years and ensure operational continuity at Centinela for at least 30 years.
AMSA will prioritize efficient technologies such as a high-pressure grinding roller (HPGR) system that will optimize the grinding process and build an overland conveyor belt of more than 6km to transport the ore from the crushing area to the plant, it said in a statement on Monday.
The engineering, procurement, construction and commissioning of the concentrator is being carried out by a consortium made up of Salfa and Fluor.
AMSA has also carried out the first movements of material in the area where a second thickened tailings deposit will be installed that will house the waste from two new pits, Esperanza Sur and Encuentro, where the use of autonomous trucks will be prioritized.
“At the beginning of June, the assembly of two Komatsu 980 E-5 extraction trucks was completed, the first of 11 units that the operation considers,” AMSA said, highlighting that after more than one year, the project is over 14% complete.
WATER AND ENERGY
Centinela will continue to be supplied with undesalinated seawater from a plant with capacity of 1,500l/s. At the beginning of June, AMSA sealed a US$600mn agreement with a consortium comprising Transelec and Alma Water Solutions to expand and operate the water pipeline.
With a focus on guaranteeing emission-free energy consumption, AMSA has a deal with electric power company Colbún to provide 912GWh annually for 15 years starting in 2025. It also has an agreement with Engie from 2022 that ensures supply of 186MW until 2033.
FINANCING
The Centinela project is financed with contributions from AMSA’s shareholders Antofagasta plc and Marubeni Corporation and by a US$2.5bn from the Japan Bank for International Cooperation (JBIC), together with the Japanese private bank Sumitomo Mitsui, government institutions from South Korea and Germany, and credit agencies from Canada and France.
AMSA aims to reach output of 900,000t/y of copper in Chile in the long term with the Centinela expansion.
https://www.bnamericas.com/en/news/anto ... er-project
-
energy_isere
- Modérateur

- Messages : 97852
- Inscription : 24 avr. 2005, 21:26
- Localisation : Les JO de 68, c'était la
-
Contact :
Message
par energy_isere » 14 juil. 2024, 09:20
China’s JCHX to invest $300m in Zambia’s Lubambe Copper Mine
China’s JCHX Mining is reportedly planning to invest $300m (2.18bn yuan) investment in the Lubambe Copper Mine in Zambia, Reuters reported.
Th move is aimed at reviving the mine, which was recently acquired by JCHX from EMR Capital, and extending its operational life.
JCHX Mining, a Shanghai-listed mining services and contracting company, holds an 80% stake in the mine, while the remaining 20% is owned by Zambia’s state mining investment arm, ZCCM Investments Holdings (ZCCM-IH).
.................................
https://www.mining-technology.com/news/ ... e/?cf-view
-
energy_isere
- Modérateur

- Messages : 97852
- Inscription : 24 avr. 2005, 21:26
- Localisation : Les JO de 68, c'était la
-
Contact :
Message
par energy_isere » 14 juil. 2024, 10:41
Une société Indonésienne prend le contrôle d'un projet de mine de Cuivre en Australie prêt à démarrer.
Australian copper project gets a boost with A$393m MACH takeover
8th July 2024 By: Mariaan Webb
Copper explorer Rex Resources will hand the development of Australia’s biggest fully permitted and shovel-ready copper project, Hillside on the Yorke Peninsula, to Indonesian group MACH.
In an offer valued at about A$393-million, MACH will acquire all the shares in Rex that it does not already own at A$0.47 apiece.
The news sent Rex’s stock soaring on the ASX to its highest level in about three years, hitting A$0.45 a share in Sydney on Monday.
The takeover offer price is a 179% premium to the price of the company’s most recent entitlement offer in January that was conducted at A$0.17 a share. It is also nearly double the company’s 90-day volume-weighted price (VWAP) of A$0.24 a share.
The transaction follows a competitive global partnering process that focused on securing A$854-million in funding for the Hillside copper/gold project.
“The transaction provides certainty of value and a significant premium representing a 98% uplift relative to Rex’s 90-day VWAP, as well as the opportunity for Rex shareholders to realise their investment at a ten-year historical share price high,” said CEO and MD Richard Laufmann.
He added that the transaction also represented a more certain outcome for wider stakeholders in Hillside, including the local community, the South Australian government and Rex employees who would benefit from the financial strength and track record of MACH to develop Hillside.
“Subject to approvals, we look forward to working with MACH through to completion and watching them develop the Hillside project, Australia’s largest fully permitted and shovel ready copper project,” said Laufmann.
According to the Rex website, Hillside contains a mineral resource of 1.9-million tonnes of copper and 1.5-million ounces of gold. In July 2020, the South Australian government approved Stage 1 of the project.
The capital expenditure for the development of the project is estimated to be A$854-million.
On average, Hillside is forecast to produce 151 500 t of copper concentrate, containing 42 000 t/y of copper and 30 500 oz/y of gold.
https://www.miningweekly.com/article/au ... 2024-07-08