Re: Les appels d' offre pour les champs de pétrole Irakien

Message par energy_isere » 20 août 2014, 13:12

suite du post au dessus.

Lukoil expédie (par le port de Basra) ses premiers barils de pétrole de son projet pétrolier développé à West Qurna-2
Lukoil Ships First Oil from West Qurna-2

by Rigzone Staff|, August 19, 2014

Russia's Lukoil reported Tuesday that the first batch of oil from its West Qurna-2 project in Iraq has been shipped from the port of Basra in the south of the country.

The shipment volume amounts to one million barrels and is being carried on the Sea Triumph vessel to the port of Augusta, Sicily. After being unloaded the oil will be transported to Lukoil's ISAB refinery in Priolo for processing.

Production at West Qurna-2 currently exceeds 280,000 barrels per day, Lukoil said, adding that the project's development is on schedule with the firm successfully fulfilling all of its contractual obligations.
https://www.rigzone.com/news/oil_gas/a/ ... est_Qurna2

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 89519
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Les appels d' offre pour les champs de pétrole Irakien

Message par energy_isere » 11 mars 2017, 21:45

Gazprom Neft met en service 3 nouveaux puits de pétrole sur le champs de Badra.
Gazprom Neft commissions three new wells at Badra field, Iraq

édité le 10/03/2017

Gazprom Neft Badra — a subsidiary of Gazprom Neft — has commissioned three new production wells (BD-2, P-14 and P-10) at the Badra field in Iraq. Total production across all three wells is running at 23,000 barrels per day, with daily production at the field totalling 77,000 barrels. All three wells are operating under free-flow production.

Gazprom Neft commissioned four new wells at the Badra field in 2016, producing a total 30,500 barrels per day. Completion of well P-19 (running to a depth of 4,945 metres, and drilled in 216 days — a record at the Badra field) is currently ongoing, with the well expected to be commissioned in early March.

Pursuant to the agreed field development programme, Gazprom Neft is continuing the construction of oil and gas infrastructure. Pre-commissioning works are currently ongoing at the gas treatment plant, with piping connections being installed, as well as electrical fixtures and automatic control systems. The first stage of this project will be commissioned in 1Q2017 and the second in 3Q2017.
.................
https://www.euro-petrole.com/gazprom-ne ... -n-i-14517

Avatar de l’utilisateur
Raminagrobis
Modérateur
Modérateur
Messages : 5216
Inscription : 17 août 2006, 18:05
Localisation : Tours, Lille parfois

Re: [Production] appels d'offre pour les champs Irakien

Message par Raminagrobis » 02 janv. 2018, 09:37

Image**

Voilà le tableau que j'avais fait en 2010, en rassemblant les annonces de l'époque.
Les objectifs de productions étaient faramineux, en additionnant tout on arrivait à 11 Mb/j...


où en est-on ?

Pour Majnoon lien Shell est parti, l'Iraq a repris l'exploitation. Le gisement produit 235 kb/j, objectif à 400 en 2020. On est très loin des 1800 kb/j promis en 2009...

Pour West Qurna 1, lien un contrat a finalement était signé en 2015 pour une installation capable de traiter seulement 100 kb/j

Pour West Qurna 2, lien Lukoil en est encore à élaborer les plans de mise en production.

A Ruimaila la production n'a pas bcp augmentée, ils sont à 1450 kb/j...
Toujours moins.