Mini réacteurs nuke / Bill Gates et TOSHIBA / TerraPower

Modérateurs : Rod, Modérateurs

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 97828
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Mini réacteurs nuke / Bill Gates et TOSHIBA / TerraPower

Message par energy_isere » 01 mars 2025, 14:05

Curtiss-Wright wins Natrium contracts

27 February 2025

Curtiss-Wright Corporation has been awarded two contracts to design and supply plant simulation and digital control solutions for TerraPower's Natrium advanced nuclear reactor.


The contracts cover the design and delivery of the Training Simulator and the Distributed Control System for the Natrium plant. The Training Simulator is a full-scope simulator that will replicate plant equipment and simulate system conditions and operations to support operator training and licensing. The Distrbuted Control System is a digital platform that serves as a core component for automating control and operation of plant processes.

The company has also been selected to develop control systems for the plant's nuclear island and its energy island. Previously, Curtiss-Wright has been selected to develop the Reactor Protection System for the Natrium plant, and the software platform and engineering services for the Natrium Engineering Simulator.

The Natrium reactor is a 345 MW sodium fast reactor coupled with a molten salt energy storage system and can simultaneously both carbon-free electricity, heat and steam to support decarbonisation of power and industrial sectors. The first reactor is being built in Kemmerer, Wyoming and TerraPower experts its first Natrium plant to be on line in 2030.
https://www.world-nuclear-news.org/arti ... -contracts

Répondre