Saipem installs second HVDC platform at Dogger Bank offshore wind farm

By NS Energy Staff Writer 18 Apr 2024

Located more than 130km off the North East coast of England, the Dogger Bank project is being developed in three 1.2GW phases, namely Dogger Bank A, B, and C and the project will feature 277 offshore turbines

Image

Saipem has installed the second unmanned high voltage direct current (HVDC) offshore substation platform at the 3.6GW Dogger Bank offshore wind project located in the UK North Sea.

Measuring 75m in length, 45m in width, and 39m in height, the platform employs a four-legged steel jacket foundation structure designed and fabricated by Saipem, installed in water depths of around 28m.

Its installation milestone marks the completion of the second platform out of three planned for deployment at the offshore wind facility, with each being supplied by Aibel.

Located more than 130km off the North East coast of England, the Dogger Bank project is being developed in three 1.2GW phases, namely Dogger Bank A, B, and C. Overall, the project will feature 277 offshore turbines.

The offshore wind project is being executed as a joint venture (JV) between Equinor (40%), SSE Renewables (40%), and Vårgrønn (20%), which in turn is owned by Eni Plenitude and Hitec Vision.

By leveraging its Saipem 7000 vessel, Saipem installed the platform 130km from the UK coastline at Dogger Bank B.

The unmanned HVDC offshore substation platform houses a Hitachi Energy HVDC system developed to transmit power more efficiently than traditional AC systems.

It will receive 1.2GW of AC power produced by the 95 offshore wind turbines of Dogger Bank B. Subsequently, the power will be converted to DC for transmission to an onshore converter station near Beverley in the East Riding of Yorkshire.

The first platform of the Dogger Bank offshore wind farm was deployed at the Dogger Bank A in April 2023. All three platforms will be remotely controlled from shore and will incorporate a streamlined design aimed at reducing weight by 70% per MW compared to previous platform designs.
............................
https://www.nsenergybusiness.com/news/s ... wind-farm/

alain2908
Hydrogène
Hydrogène
Messages : 2376
Inscription : 13 nov. 2005, 09:58

Re: Grande Bretagne : Projet eoliens offshores géants

Message par alain2908 » 25 avr. 2024, 07:13

j'ai pas tout compris mais j'ai trouvé ça interessant
Le 15 avril 2024, 13h, la part de l'électricité fossile tombe à un plancher record de 2,4 % dans le mix britannique.
La part de la prod éolienne/PV atteint 70,9 %, celle des productions non synchrones 79,9 % (?!).

Thread technique sur la stabilité du réseau britannique
https://twitter.com/DecrypteEnergie/sta ... 4800773187

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 90259
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Grande Bretagne : Projet eoliens offshores géants

Message par energy_isere » 25 avr. 2024, 08:37

alain2908 a écrit :
25 avr. 2024, 07:13
j'ai pas tout compris mais j'ai trouvé ça interessant
Le 15 avril 2024, 13h, la part de l'électricité fossile tombe à un plancher record de 2,4 % dans le mix britannique.
La part de la prod éolienne/PV atteint 70,9 %, celle des productions non synchrones 79,9 % (?!).

Thread technique sur la stabilité du réseau britannique
https://twitter.com/DecrypteEnergie/sta ... 4800773187
ca doit être un problème de traduction.

lire non synchrone comme Intermittent ou pas totalement controlables/prévisible.