Lituanie

Impact de la déplétion sur la géopolitique présente, passée et à venir.

Modérateurs : Rod, Modérateurs

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 97828
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Lituanie

Message par energy_isere » 26 févr. 2023, 23:11

Lithuania will tender 700 MW of offshore wind power

February 25, 2023 evwind

The Lithuanian Ministry of Energy is preparing to announce a tender to develop an offshore wind farm.

Image

The ministry has submitted draft government resolutions for public consultation, covering the location in the Baltic Sea where a 700 MW offshore wind farm would be developed, as well as the requirements for bidders.

According to the plan, the offshore wind farm will be developed around 36 km offshore and installed by 2028, providing up to a quarter of Lithuania’s total electricity demand.
.....................
https://www.evwind.es/2023/02/25/lithua ... ower/90385

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 97828
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Lituanie

Message par energy_isere » 09 août 2023, 23:54

Lithuania kicks off offshore wind with first 700 MW auction

August 7, 2023 evwind

The Lithuanian Government presented the results of its very first offshore wind auction. A consortium of the Ignitis Group and OceanWinds is the winner. They were willing to pay €20m to develop the project. It will most likely be operational by 2030. The consortium has received a permit to operate the site for 41 years.
..........................
https://www.evwind.es/2023/08/07/lithua ... tion/93278

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 97828
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Lituanie

Message par energy_isere » 13 oct. 2023, 20:27

Ocean winds confirmé comme lauréat du premier parc éolien en mer en Lituanie

Publié le 13/10/2023 lemarin

Le groupe énergétique lituanien Ignitis a confirmé, le 12 octobre, que sa filiale Ignitis renewables, associée à Ocean winds, la coentreprise d’Engie et d’EDP Renovaveis, avait bien remporté le premier appel d’offres éolien en mer en Lituanie.
https://lemarin.ouest-france.fr/secteur ... anie-49151

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 97828
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Lituanie

Message par energy_isere » 16 janv. 2024, 20:23

La Lituanie lance son second appel d’offres pour un projet de parc éolien en mer
Le régulateur de l’énergie lituanien a ouvert, le 16 janvier, un appel d’offres pour 700 MW d’éolien en mer Baltique. Une seconde procédure pour laquelle a été introduite la possibilité de bénéficier d’un complément de rémunération.

Loïc FABRÈGUES. Le marin 16 janv 2024

Après un premier parc de 700 MW attribué en octobre au tandem formé par Ignitis et Ocean winds, la Lituanie vient de lancer un second appel d’offres pour l’éolien en mer. La procédure porte sur l’attribution de 700 MW supplémentaires dans un secteur de 136 km2, à une trentaine de kilomètres, au large de la ville de Klaipeda qui abrite le principal port du pays.
https://lemarin.ouest-france.fr/energie ... b95da3b2ac

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 97828
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Lituanie

Message par energy_isere » 27 mai 2024, 10:31

Lituanie: le président Gitanas Nauseda triomphalement réélu
AFP •27/05/2024
https://www.boursorama.com/actualite-ec ... 6d527aaac0

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 97828
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Lituanie

Message par energy_isere » 16 juil. 2024, 20:47

Les 3 pays baltes quitteront en février 2025 le réseau électrique de l'ère soviétique

AFP le 16 juill. 2024

Les trois pays baltes ont annoncé mardi avoir notifié à la Russie et à son allié le Bélarus, leur décision de se séparer, dès février 2025, du réseau électrique datant encore de l'ère soviétique.

« Nous allons couper les derniers liens énergétiques avec la Russie »

L'Estonie, la Lettonie et la Lituanie, qui pendant des décennies avaient été gouvernées par l'Union soviétique, et qui font désormais partie de l'UE et de l'Otan, ont ainsi franchi une étape importante vers l'indépendance énergétique vis-à-vis de Moscou.

Ces trois pays ont entretenu des relations tendues avec Moscou depuis qu'ils ont recouvré leur indépendance au début des années 1990, et ces liens se sont encore détériorés depuis que la Russie a envahi l'Ukraine en février 2022.

"Nous allons couper les derniers liens énergétiques avec la Russie", a déclaré Rokas Masiulis, directeur de Litgrid, l'opérateur public du réseau électrique lituanien. "Dans six mois, nous ne nous déconnecterons pas seulement du réseau électrique russe et bélarusse, mais nous démantèlerons également les dernières lignes électriques qui en restent", a-t-il ajouté.

Des représentants de l'opérateur letton AST et de l'opérateur estonien Elering ont aussi annoncé cette décision.

7 février 2025

Elering a indiqué dans un communiqué que "les systèmes électriques des trois États baltes sont déjà prêts pour une synchronisation d'urgence à tout moment, si cela s'avère nécessaire". De son côté, AST a précisé que les trois opérateurs baltes "ont notifié aux opérateurs russes et bélarusses la non-prolongation de l'accord BRELL" en question.

Les États baltes se déconnecteront du réseau russe le 7 février, pour rejoindre le réseau européen deux jours plus tard. Bien qu'ils aient déclaré leur indépendance de l'Union soviétique en 1991, leurs réseaux électriques sont restés connectés à la Russie et au Bélarus.

Leur fréquence est donc régulée depuis le siège de Moscou, ce qui signifie qu'ils dépendent toujours de la Russie pour assurer un flux d'électricité stable.

Les trois pays ont décidé en 2018 de synchroniser leurs réseaux électriques avec le système continental européen, après avoir obtenu un soutien financier de l'Union européenne. Ils accèderont au réseau électrique de l'UE via la Pologne.

Les États baltes ont cessé d'acheter du gaz russe et l'électricité après l'invasion de l'Ukraine par Moscou. Mais même s'ils n'achètent plus d'électricité russe, ils ont dû rester connectés à l'ancien réseau pour des raisons techniques et de sécurité.
https://www.connaissancedesenergies.org ... que-240716

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 97828
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Lituanie

Message par energy_isere » 22 sept. 2024, 22:33

Port of Riga to host 100 MW solar plant
Lithuania’s SNG Solar is set to build a 100 MW solar plant in the port of Riga, Latvia. Upon completion, the facility will be one of the largest solar projects in the Baltics.


September 17, 2024 Patrick Jowett

Lithuanian solar developer SNG Solar has signed an agreement with the Freeport of Riga Authority to construct a 100 MW solar plant in the port of Riga

SNG Solar will build the 100 MW solar plant within five years, as outlined in the agreement. The project will involve installing solar panels, connecting them to a 110 kV line, and building a high- and medium-voltage substation. Total investment is projected to be between €60 million ($66.8 million) and €80 million.

Earlier this year, SNG Solar secured the land lease rights through an auction. The Freeport of Riga will receive 2.5% of the green energy generated, which will support port infrastructure and operations. The plant is expected to produce about 100,000 MWh of green electricity per year.

The 100 MW solar facility will be constructed on a 177.2-hectare site in Spilve Meadows, on the left bank of the Daugava River in Riga. This project is part of the Freeport's plan to transform the area into a hub for solar electricity production, energy storage, hydrogen, and alternative fuel production, as well as an industrial and logistics park.

Once completed, the project will be one of the largest solar parks in the Baltics. In May 2023, Latvian developer PurpleGreen Energy B announced plans for a 400 MW solar power plant near the Russian border.

According to the International Renewable Energy Agency, Latvia had installed 353 MW of solar capacity by the end of 2023.
https://www.pv-magazine.com/2024/09/17/ ... lar-plant/

ils arrivent donc à produire 1000 MWh annuel par MWc installé malgré la haute latitude.

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 97828
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Lituanie

Message par energy_isere » 03 nov. 2024, 10:02

Sunly starts construction of three solar parks in Latvia
Estonian renewable energy company Sunly is building three solar parks in Latvia with a cumulative capacity of 225 MW. The projects are being developed as hybrid parks, combining solar with wind and battery energy storage.


November 1, 2024 Patrick Jowett

Sunly, a renewable energy developer based in Tallinn, Estonia, has started work on three large-scale solar parks in Latvia.

The projects include a 54 MW solar park in the Valmiera municipality of northern Latvia and a 90 MW solar park in the Krāslava municipality of southeastern Latvia, where foundations are being laid for a substation. The third project is a 81 MW park in the Madona municipality, central Latvia, where Sunly has previously implemented a 11 MW solar facility.

With a combined capacity of 225 MW, the three projects will be capable of meeting the annual electricity consumption of over 118,000 households.

Each project is being developed as a hybrid park, combining solar with wind and battery energy storage, which the company says will enhance the predictability of energy production and reduce grid connection and operational costs.

Priit Lepasepp, Sunly CEO, says the company is aiming to integrate storage solutions into as many solar and wind parks as possible. “Continuous technological development is essential if we are to increase security and stability in the energy market in the region,” Lepasepp added. The construction is underway ahead of the three Baltic states, Latvia, Estonia and Lithuania, disconnecting from BRELL, a Russia-controlled frequency system, next February.

Sunly says it has secured €300 million ($326 million) in funding from France's Rivage Investment, Copenhagen Infrastructure Partners and Norway’s Kommunal Landspensjonskasse to develop renewables projects in the Baltic region and Poland. Its website claims to have 227 MW of solar and wind projects in operation, with 20 GW in the pipeline and development stage.

According to the International Renewable Energy Agency, Latvia had installed 353 MW of solar capacity by the end of 2023. In September, plans were unveiled for a 100 MW solar plant located at the port of the country’s capital, Riga.
https://www.pv-magazine.com/2024/11/01/ ... in-latvia/

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 97828
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Lituanie

Message par energy_isere » 28 nov. 2024, 00:02

US to Support Nuclear Power Development in Lithuania

by Jov Onsat|Rigzone Staff | Wednesday, November 27, 2024

Lithuania and the United States have signed an agreement that secures American support for the development of nuclear energy-fueled electricity generation in the Baltic state and in turn the decoupling of the Baltic power grid from Russia.

“This agreement marks the first such intergovernmental framework led by the Department of Energy with a specific focus on the deployment of fourth-generation small modular reactors and represents a significant element of the United States’ advancement of the development of clean, safe, and reliable nuclear power for partners and allies”, the U.S. Department of Energy (DOE) said in an online statement.

The pact will “reinforce Lithuania’s capacity to serve as a regional energy exporter, particularly as all the Baltic states desynchronize from the Russian electricity grid and connect to Europe’s continental grid network”, the DOE said.

“The Agreement will also serve to bolster the U.S. civil nuclear industry, U.S. technological leadership and U.S. competitiveness while advancing the highest standards of safety and security”.

Lithuanian Energy Minister Dainius Kreivys said, “Lithuania is particularly interested in the U.S experience in developing next-generation nuclear power technologies which could provide secure, safe and reliable supply of energy to meet the country's growing energy needs and achieve climate-neutrality goals”.

“This agreement between the U.S. and Lithuania will help to make an informed decision on the development of next-generation nuclear power in Lithuania”, Kreivys added.

Lithuania and Baltic neighbors Estonia and Latvia agreed last year to accelerate the decoupling of their power infrastructure from Russia for integration with continental Europe, in a move prompted by Russia's invasion of Ukraine.

Under a joint declaration by their prime ministers, "the deadline for synchronization [with the Continental Europe Network] is brought forward from the end of 2025, as initially established by political declarations in 2018 and 2019, to February 2025", the European Commission said in a statement August 3, 2023.

The latest declaration cited risks from the Russia-Ukraine war. Russia’s invasion launched February 2022 has "significantly deteriorated the energy security situation in the region and increased the risks of unplanned de-synchronization of the Baltic States’ electricity systems from IPS/UPS", read the text of the declaration, referring to the grid system linking the three countries to Russia.

The three nations' electricity supply systems are already connected with Finland, Poland and Sweden. "For historical reasons, however, the Baltic States' electricity grid is still operated in a synchronous mode with the Russian and Belarusian systems", the Commission explained. Estonia, Latvia and Lithuania were part of the Soviet Union.
https://www.rigzone.com/news/us_to_supp ... 0-article/

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 97828
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Lituanie

Message par energy_isere » 06 déc. 2024, 21:00

La Lituanie acquiert un terminal flottant de GNL, consolidant son indépendance vis-à-vis du gaz russe

AFP le 06 décembre 2024

La Lituanie a célébré vendredi l'acquisition formelle d'un terminal flottant de gaz naturel liquéfié (GNL), une nouvelle étape sur le parcours de ce pays balte visant à mettre fin à sa dépendance vis-à-vis du gaz russe.

Baptisé Independence, le terminal a déjà été exploité pendant dix ans sur la base d'un contrat de location. Il est considéré dans ce pays balte comme une pierre angulaire de sa stratégie de sécurité énergétique.

Bien qu'elle ait rejoint l'UE et l'Otan en 2004, la Lituanie a longtemps dépendu entièrement de la Russie pour son approvisionnement en gaz naturel, héritage de cinq décennies de domination soviétique sur cette région, achevée en 1990.

Propriété du norvégien Hoegh Evi, le terminal a depuis dix ans permis à la Lituanie d'importer jusqu'à quatre milliards de mètres cubes de gaz par an, au delà des besoins nationaux de la Lituanie, et de livrer des excédents à ses voisins baltes de Lettonie d'Estonie, ainsi qu'à la Pologne et la Finlande.

En dix ans, la Lituanie a payé un total de 689 millions de dollars en frais de sa location. Pour finaliser l'achat du terminal, Vilnius a dû débourser 138 millions d'euros supplémentaires.

Le drapeau national lituanien a été hissé vendredi sur ce bateau long de 294 mètres, inscrit désormais dans les registres lituaniens.

Cette acquisition permet de "mettre fin à des décennies de monopole et de chantage politique russe", s'est félicité le président lituanien Gitanas Nauseda lors d'une cérémonie dans le port de Klaipéda qui a réuni aussi ses deux homologues baltes et polonais.

Ces dernières années, la région a continué à diversifier ses infrastructures énergétiques. En 2022, la Lituanie et la Pologne ont inauguré un nouveau gazoduc reliant les deux pays.
https://www.connaissancedesenergies.org ... sse-241206

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 97828
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Lituanie

Message par energy_isere » 08 janv. 2025, 20:26

La Lituanie renforce la protection de ses connexions électriques avec l'UE par crainte de sabotages

AFP le 08 janvier 2025

La Lituanie qui doit prochainement se déconnecter du réseau électrique russe a annoncé mercredi qu'elle allait renforcer les mesures de sécurité destinées à protéger une importante connexion électrique la reliant à la Pologne voisine et à l'UE, par crainte de sabotages éventuels.

LitPol Link sous surveillance à partir du 15 janvier

Ancienne république soviétique, la Lituanie, ainsi que ses voisins baltes, la Lettonie et l'Estonie, doivent se déconnecter du réseau électrique russe le 8 février, marquant ainsi l'aboutissement de décennies d'efforts visant à réduire leur dépendance à l'égard de Moscou.

Les trois pays, aujourd'hui membres de l'UE et de l'Otan, rejoindront le réseau européen un jour plus tard.

Le gouvernement lituanien a annoncé mercredi que le Service de sécurité publique, chargé de protéger des infrastructures critiques, commencerait à surveiller le pont énergétique entre la Lituanie et la Pologne, appelé LitPol Link, dès le 15 janvier, et non pas seulement en avril comme prévu auparavant.

"Toutes les versions possibles de sabotages ou de diversion sont évaluées, de la cybersécurité à des actes physiques", a déclaré le Premier ministre Gintautas Paluckas à la presse.

Un sabotage présumé en mer Baltique en décembre

Le réseau électrique lituanien est également relié à la Suède, via la mer Baltique, connexion qui sera placée sous la protection du Service de sécurité publique en avril comme prévu initialement. Le 25 décembre, des câbles électriques et de télécommunications en mer Baltique reliant l'Estonie et la Finlande ont été endommagés à la suite d'un sabotage présumé.

Les autorités finlandaises ont annoncé mercredi avoir interdit de naviguer au Eagle S, un pétrolier soupçonné d'appartenir à la "flotte fantôme" russe et d'avoir causé des dégradations sur cinq câbles sous-marins.

Le navire, battant pavillon des îles Cook, avait déjà été saisi par les autorités finlandaises dans le cadre d'une enquête criminelle sur des soupçons de sabotage.

Bien que les trois pays baltes aient déclaré leur indépendance de l'URSS en 1991, leurs réseaux électriques sont restés connectés à la Russie et au Bélarus. Leur fréquence est donc régulée depuis Moscou, ce qui signifie qu'ils dépendent toujours de la Russie pour assurer un flux d'électricité stable.

Les trois pays ont décidé en 2018 de synchroniser leurs réseaux électriques avec le système continental européen, après avoir obtenu un soutien financier de l'Union européenne. Ils accèderont au réseau électrique de l'UE via la Pologne.

Les États baltes ont cessé d'acheter du gaz russe et l'électricité après l'invasion de l'Ukraine par Moscou en 2022.
https://www.connaissancedesenergies.org ... ges-250108

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 97828
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Lituanie

Message par energy_isere » 13 avr. 2025, 23:15

Lithuania deploys 870 MW of solar in 2024
Lithuania added record solar capacity in 2024, pushing cumulative installations to nearly 2 GW, driven largely by residential systems and a favorable regulatory framework.

April 9, 2025 Patrick Jowett

Lithuania added 870 MW of solar in 2024, setting a new calendar-year record and surpassing the 572 MW installed in 2022 and 536 MW in 2023.

The additions raised Lithuania’s total solar capacity to more than 1.97 GW, including nearly 1.4 GW of residential solar and 583 MW of utility-scale capacity.
............................
https://www.pv-magazine.com/2025/04/09/ ... r-in-2024/

Répondre