Re: Le Cuivre

Message par energy_isere » 07 sept. 2025, 15:44

Le cuivre à 10 000 dollars par tonne sur le London metal exchange. 1sept 2025

https://www.mining.com/subscribe-login/?id=1187043

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 100888
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Le Cuivre

Message par energy_isere » 10 sept. 2025, 12:50

j'avais raté ceci de fevrier 2025.
BHP awards Olympic Dam expansion contract

Olivia Thomson February 3, 2025

BHP has awarded a contract worth approximately $40 million to support the proposed expansion of its Olympic Dam copper smelter and refinery facilities in South Australia.


A joint venture between Fluor Australia and Hatch have been granted the engineering, procurement and construction management (EPCM) contract following engagement with BHP’s major projects, procurement, commercial and Copper South Australia teams.

The contract will be executed in stages as BHP progresses towards a final investment decision on the smelter and refinery expansion, which is expected in the first half of the 2026–27 financial year (FY27).

“Fluor and Hatch are experienced global EPCM partners with significant shared experience in delivering mega projects, who will bring the right level of scale and expertise to help BHP progress its copper growth plans in South Australia,” BHP Group procurement officer Rashpal Bhatti said.

“The growth potential for Copper SA is exciting and this first stage of EPCM works will be key as we progress the proposal for an expanded copper smelter and refinery at the heart of South Australia’s growing copper province towards a final investment decision.”

Last September, BHP outlined how it plans to potentially double its copper production in South Australia over the next decade.

The Big Australian would introduce a phased approach to increase refined copper cathode production to 500,000 tonnes (t) annually by the early 2030s, with a possible boost to 650,000t by the mid-2030s. This would be a significant jump from the approximately 322,000t produced in FY24.

Phase one of the strategy would involve upgrading the existing copper smelter and refinery at Olympic Dam to a two-stage smelter and extension of refinery facilities, with a capacity to produce more than 500,000t per year.

“It is critical that we prudently manage our spending to achieve the vision that BHP shares with many others to grow copper production in South Australia, and we have worked closely with Fluor and Hatch on a contract structure that supports this,” Bhatti said.

BHP’s Copper South Australia business comprises Olympic Dam, the Carrapateena and Prominent Hill mines, and the Oak Dam deposit, the latter of which has 13 rigs currently carrying out exploration in a bid to advance its studies.

“BHP is building momentum in South Australia, and this is another step forward in our strategy to increase the production of SA’s high-quality copper resources to support the global energy transition,” BHP asset president Copper SA Anna Wiley said.

“BHP has established a world-scale copper province in South Australia and we are working at pace to progress our plans to lift production further over the coming decade.”
https://www.australianmining.com.au/bhp ... -contract/

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 100888
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Le Cuivre

Message par energy_isere » 10 sept. 2025, 13:25

La géologie de la mine de de Olympic Dam est très particulière, avec de l'Uranium dans le cuivre et l'or, ce qui est rare sur la planète.

vidéo8 mn https://www.youtube.com/watch?v=96NWd1L9jdg avec malheureusement quelques séquences avec images IA qui n'apportent rien.

L'un des gisements minéraux les plus étranges et les plus riches jamais découverts
OzGeology
147 k abonnés

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 100888
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Le Cuivre

Message par energy_isere » 10 sept. 2025, 14:08

vidéo ancienne sur les débuts de Olympic Dam au sujet du Cuivre avant que ca appartienne à BHP, du temps de WMC = Western mining Corporation, en 1994.

From the Archives: Olympic Dam, Today and Beyond (1994) vidéo 15 mn https://www.youtube.com/watch?v=zTYhdn3COP8
BHP
24,2 k abonnés

timing 6mn30s Le minerai aprés concentration est fondu et une pureté de 99.6 % en cuivre est obtenue
timing 7mn coulée du cuivre en lingots
timing 7mn30s raffinage électrolytique et une pureté de 99.99 % en cuivre est obtenue . Les cathodes mettent 7 jours à se former.
timing 8mn14s ce qui est déposé au fond des cuves d'électrolyse contient l'Argent et l' Or qui peut étre fondu et coulé.
timing 10mn27s Roxby Downs la ville spécialement construite à 10 km de la mine, 3000 habitants (dans le reportage) 4000 maintenant
timing 11mn30s expédition des plaques de cuivre raffinées au port d'Adelaide
timing 12mn05s les futs de U3O8, ensuite chargé en conteneurs et expédiés par camions.

Image

courte vidéo sur la coulée de l'Or a Olympic dam, un beau lingot de 15.3 kg https://www.youtube.com/watch?v=krU8i2jrCo4
au cours du jour le gars il a 1.5millions euro entre les mains !

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 100888
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Le Cuivre

Message par energy_isere » 11 sept. 2025, 09:05

Cuivre : Méga fusion à venir entre les géants miniers Anglo American et Teck

Les géants miniers Anglo American et Teck ont annoncé, mardi 9 septembre dans la matinée, une «fusion entre égaux» visant à créer l'un des plus grands producteurs de minerai de cuivre du monde. L'opération vient après de nombreuses tentatives de giga-rachat dans le secteur sur fond de ruée vers le métal rouge, star de la transition énergétique.

09 septembre 2025

abonnés
https://www.usinenouvelle.com/article/c ... k.N2237377
Anglo American, Teck Resources to merge in second-largest mining deal ever

By Clara Denina September 9, 2025

London-listed miner Anglo American (AAL.L), opens new tab and Canada's Teck Resources (TECKb.TO), opens new tab plan to merge, the two companies said on Tuesday, marking the sector's second-biggest M&A deal ever and forging a new global copper-focused heavyweight.
Under the proposed deal, which will require regulatory approvals, Anglo American shareholders would own 62.4% of new company Anglo Teck, while shareholders in Teck would hold 37.6%.
Anglo Teck will be headquartered in Canada but have a primary stock listing in London, said the two companies, whose combined market capitalisation exceeds $53 billion.

The deal to form the world's fifth-largest copper company is also a big bet on copper by Anglo. Glencore's (GLEN.L), opens new tab $90 billion merger with Xstrata in 2013 remains the largest mining deal in history.
Copper, used in the power and construction sectors, is set to benefit from burgeoning demand spurred by electric vehicles and artificial intelligence.
Miners have raced to develop new projects and there have been a flurry of takeover bids, though no major acquisition has so far succeeded.
.......................
https://www.reuters.com/world/uk/anglo- ... 025-09-09/

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 100888
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Le Cuivre

Message par energy_isere » 18 sept. 2025, 09:51

Anglo American et Teck Ressources, un mariage taillé pour le marché du cuivre

RFI le : 17/09/2025

En fusionnant leurs activités, les deux géants miniers vont créer le cinquième producteur mondial de cuivre. L'extraction de ce qu'on surnomme le minerai de la transition représentera alors 70% de leur production.


Ces dernières années, les deux miniers avaient dû résister aux assauts de rivaux qui voulaient les avaler. Le Canadien Teck avait déjoué l'offensive du trader suisse Glencore, le britannique Anglo American, repoussé les offres successives de l’Australien BHP. Avec ce mariage, les deux groupes sortent de la catégorie des proies et regagnent des marges de manœuvre. « Ils vont être en mesure d’investir et d’optimiser leurs coûts sur le marché du cuivre où seuls les très gros acteurs tirent leur épingle de jeu », explique Yves Jégourel, professeur titulaire de la chaire Économie des matières premières et transitions durables, au Conservatoire National des Arts et Métiers.

Un marché très volatil

Malgré la demande en hausse, le marché du cuivre reste difficile. C’est tout le paradoxe de cette matière première. Si son prix a bien grimpé depuis dix ans, il ne s'envole pas encore, et ce, alors que la teneur en minerai des gisements a tendance à diminuer. « Les cours restent en plus soumis à une forte volatilité », confirme Yves Jégourel. Le marché va par exemple tenir compte du niveau de l’activité chinoise et si cette dernière ralentit, le prix du cuivre risque de baisser. Cela créé de l’incertitude pour les actionnaires et, in fine, freine l’investissement, explique le chercheur en guise d'illustration.

Pourtant, les ressources en cuivre vont être de plus en plus exploitées dans les années à venir. Les besoins auront doublé en 2040. Une voiture électrique en contient quatre fois plus qu’une voiture thermique. Le développement des énergies renouvelables aussi réclame du cuivre, tout comme la construction des infrastructures électriques pour lesquelles il n’existe quasiment pas de possibilité de substitution.

Des co-actionnaires à convaincre

Selon Yves Jégourel, si cette fusion apparaît comme une évidence, c'est principalement parce que Teck Resources et Anglo American possèdent chacun une très importante mine au Chili. Les deux gisements sont distants de seulement une quinzaine de kilomètres : une proximité qui va permettre de créer des synergies et donc réduire les coûts. Notamment de profiter de la production d’Anglo American pour faire tourner l’usine de traitement du minerai de Teck Resources. Les experts soulignent aussi la qualité des autres mines que les deux groupes possèdent. Une fois la création du nouveau groupe Anglo Teck définitivement entérinée, il deviendra le cinquième producteur mondial. Le cuivre représentera 70% de sa production totale.

Mais l’opération n’est qu’aux prémices. Sa finalisation prendra entre 18 et 24 mois. Les deux miniers devront notamment trouver des accords avec leurs co-actionnaires. Au Chili, Teck possède 60% de Quebrada Blanca et Anglo American seulement 44% de Collahuasi, à égalité avec Glencore. Il n’est pas impossible que les deux groupes reçoivent dans l’intervalle une meilleure offre, qui fasse capoter le projet commun. Car dans les affaires encore plus qu’ailleurs, il n’y a pas d’amour, il n’y a que des preuves d’amour.
https://www.rfi.fr/fr/podcasts/chroniqu ... -du-cuivre

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 100888
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Le Cuivre

Message par energy_isere » 20 sept. 2025, 10:38

suite de ce post du 09 sept 2023 : viewtopic.php?p=2376618#p2376618
Orion vise au moins 200 millions $ pour lancer le projet de cuivre-zinc sud-africain Prieska

Agence Ecofin 17 sept 2025

Selon son étude de faisabilité définitive, le projet Prieska vise une capacité nominale annuelle de 22 000 tonnes de cuivre et 65 000 tonnes de zinc. Le programme d’exploitation comprend deux phases s’étendant sur une période de 13,2 ans.

Orion Minerals a annoncé ce mercredi 17 septembre la signature d’un accord de financement non contraignant avec la société de négoce suisse Glencore. Dans le cadre de cette initiative, la compagnie compte sécuriser entre 200 et 250 millions USD pour soutenir les travaux de construction de son projet de cuivre et de zinc Prieska en Afrique du Sud, en échange d’un contrat d’approvisionnement pour son partenaire.

Dans le détail, la transaction devrait s’effectuer en deux tranches, la première de 40 millions USD pour lancer la phase de développement initiale de la future mine. La deuxième tranche visant un financement de 160 à 210 millions USD sera ensuite allouée à la construction de la phase 2 de Prieska. Parallèlement à ces prêts, la société devrait finaliser avec Glencore les termes d’un accord d’enlèvement qui porte sur 100% de la production de la mine pendant 10 ans.

Selon une étude de faisabilité publiée en mars dernier, Prieska devrait produire annuellement 22 000 tonnes de concentré de cuivre et 65 000 tonnes de zinc, une fois pleinement opérationnelle. La mine devrait afficher une durée de vie de 13,2 ans, et le financement maximal nécessaire à son développement est évalué à 578 millions AUD (environ 385 millions USD).

La finalisation de l’accord avec Glencore est toujours soumise à plusieurs conditions, dont la réalisation d’une due diligence. Les deux parties entendent, apprend-on, aboutir à un « accord contraignant dans les quatre à six prochaines semaines ». En attendant, Orion indique vouloir poursuivre les négociations avec d’autres potentiels bailleurs de fonds. La mise en service de Prieska est prévue 13 mois après le démarrage des travaux de construction.
https://www.agenceecofin.com/actualites ... in-prieska

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 100888
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Le Cuivre

Message par energy_isere » 21 sept. 2025, 10:05

suite de ce post du 11 mai 2025 : viewtopic.php?p=2411099#p2411099

Bientot une mine au projet Josemaria
BHP-Lundin JV to invest more than $400m in Argentine copper project
The JV is currently engaged in pre-construction activities at the Josemaria deposit.


September 18, 2025

Vicuña, a joint venture (JV) between BHP and Lundin Mining, is reportedly investing more than $400m (C$551.16m) in Argentina as it gears up to seek approvals for a multibillion-dollar mining project.

The initiative is expected to establish the region as a significant production hub for copper, reported Bloomberg.

The JV is currently engaged in pre-construction activities at the Josemaria deposit in a remote area of San Juan province, stated Jose Luis Morea, Vicuña’s senior country manager for Argentina and Chile.

By the end of March next year, Vicuña plans to present a comprehensive report to its board, detailing the project’s progress and outlining the processing method that will be employed.

Furthermore, the venture is in the process of preparing an application for tax, customs and currency exchange benefits offered through the country’s investment incentives programme, commonly referred to by its Spanish acronym, Rigi.

With its substantial budget, Vicuña is reported to have emerged as one of the country’s largest overseas investors this year, while it continues to assess the total development costs of the project, which also encompasses the Filo del Sol deposit.

Once viewed as a pariah due to state intervention, Argentina is gradually restoring the confidence of overseas companies, due to President Javier Milei’s efforts to safeguard their investments.

Morea said: “Rigi is critical. It levels the playing field and allows for the project to be competitive in tax terms when compared to other jurisdictions in Latin America and across the world.”

To be effective in October for minimum investments of $2bn, Rigi will be in place until July 2026, with a potential extension of one year.

Morea refrained from providing specific estimates for capital expenditure and production, stating only that the venture is expected to rank among leading copper, gold and silver mines once it becomes operational in the 2030s.

“We now have an integrated project that combines two deposits and a single processing facility, creating synergies and unlocking additional value. Everything is on the table, and we are optimising all available options,” he added.
https://www.mining-technology.com/news/ ... t/?cf-view

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 100888
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Le Cuivre

Message par energy_isere » 21 sept. 2025, 10:18

Le fond d'investissement du Qatar investi 500 millions de dollars dans le minier Ivanohe.
Friedland sells 4% of Ivanhoe to Qatar for $500M
Colin McClelland | September 17, 2025
https://www.mining.com/friedland-sells- ... -for-500m/

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 100888
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Le Cuivre

Message par energy_isere » 27 sept. 2025, 11:08

Cuivre : l’offre mondiale sous pression en 2025 face aux aléas en RDC et en Indonésie

Agence Ecofin 26 sept 2025

Selon l’AIE, le marché du cuivre pourrait être confronté à un déficit d’approvisionnement de 40% d’ici 2035, en raison d’une offre future restreinte et d’une forte demande liée à la transition énergétique. Les prévisions à court terme des experts sont par contre globalement excédentaires, comme en 2023 et en 2024.

Le jeudi 25 septembre, Goldman Sachs a revu à la baisse ses prévisions d’approvisionnement mondial en cuivre pour 2025, anticipant désormais un déficit de 55 500 tonnes contre un excédent de 105 000 t auparavant. Cette révision est consécutive à l’annonce par la société minière américaine Freeport-McMoran d’un cas de force majeure sur ses contrats de vente du métal rouge.

Elle illustre plus largement les tensions croissantes qui pèsent sur l’offre cuprifère, dans un contexte d’aléas touchant plusieurs sites de production clés, en particulier en Indonésie et en République démocratique du Congo. Un incident de coulée de boue survenu ce mois-ci à la mine Grasberg opérée par Freeport-McMoran en Indonésie, devrait notamment entraîner un « report significatif de la production à court terme ».
Alors qu’elle indique réévaluer ses plans de production, l’entreprise a suspendu les opérations sur cet actif qui a livré 816 466 tonnes en 2024, se classant comme la deuxième plus grande mine de cuivre au monde. Un redémarrage des activités au niveau des zones non affectées est attendu d’ici le quatrième trimestre.

Dans le même temps, la société minière chilienne Codelco poursuit des travaux pour limiter les dégâts d’un séisme ayant frappé en août sa mine El Teniente, la plus grande exploitation souterraine de cuivre au monde. L’événement qui a coûté la vie à six employés sur le site, a aussi causé une réduction de 33 000 tonnes de l’objectif de production pour 2025, désormais fixé à 316 000 tonnes. Même son de cloche à Kamoa-Kakula, plus grande mine de cuivre d’Afrique et quatrième à l’échelle mondiale.

Suite à une activité sismique survenue en mai, le canadien Ivanhoe Mines prévoit désormais d’y produire jusqu’à 420 000 tonnes cette année, contre 580 000 t initialement. En atteignant cette cible révisée, Kamoa-Kakula verrait sa production baisser de 4% par rapport aux 437 061 tonnes produites l’année passée. C’est sur la base de ces développements que s’inscrit donc la projection de déficit formulée par Goldman Sachs.

Une concrétisation de cette prévision mettra fin à une série de deux années consécutives d’excédent mondial enregistré en 2023 et 2024. Bien que les pôles de production cités plus haut soient importants, il faut aussi noter que l’hypothèse d’un déficit repose sur les performances des autres mines de cuivre en activité, et surtout sur le niveau de demande du marché. Rappelons que l’International Copper Study Group (ICSG) avait prédit en avril dernier un excédent mondial de 289 000 tonnes de cuivre, sur la base d’une demande affectée par les frais de douane américains et d’une croissance de l’offre.

Historiquement, un marché déficitaire du cuivre soutient les prix, comme en mai 2021 où il a atteint les 11 700 USD la tonne, porté par une hausse de la demande et une offre restreinte. Les cours du métal rouge semblent déjà bien réagir aux perturbations enregistrées sur la chaîne d’approvisionnement. Selon Trading Economics, les contrats à terme ont atteint dans la journée du jeudi un sommet de près de deux mois, dépassant les 4,75 USD la livre (environ 10 400 USD/tonne) en raison du cas de force majeure annoncé par Freeport-McMoran en Indonésie.
https://www.agenceecofin.com/actualites ... -indonesie

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 100888
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Le Cuivre

Message par energy_isere » 27 sept. 2025, 11:12

et au sujet de l'accident à la mine de Grasberg (post au dessus) : 2 morts et de gros dégâts matériels.
Freeport announces force majeure at Grasberg mine in Indonesia
The company anticipates a reduction in copper and gold sales due to the disruption of operations after a mud rush incident.

September 25, 2025

reeport-McMoRan has declared force majeure at its Grasberg block cave mine in Indonesia after a significant mud rush incident impacted operations.

The company anticipates a reduction in copper and gold sales due to the disruption.

According to Freeport, around 800,000 tonnes (t) of wet material entered the mine on 8 September, affecting multiple levels including crucial service areas.

The company confirmed two fatalities as of 20 September, while search and recovery efforts were on for five missing members.

On 9 September, Freeport announced the temporary suspension of operations at the mine to prioritise the rescue mission.

The incident has led to extensive damage across the mine’s infrastructure, affecting mobile equipment, rail systems and electrical installations.

Freeport is currently investigating the cause, with external experts involved in the process, which is expected to conclude by the end of 2025.

Freeport board chairman Richard Adkerson and president and CEO Kathleen Quirk said: “We are grieving for our coworkers lost in this tragic incident and extend our sincere condolences to the families who lost loved ones and who remain missing.

“We recently visited the site to offer support to the families and express our appreciation for the extraordinary efforts of the PTFI [PT Freeport Indonesia] organisation and the emergency response team.”

The Grasberg mine accounts for half of Freeport’s proven and probable reserves and 70% of its projected copper and gold output through 2029.

In light of the incident, the company is re-evaluating its production forecasts, with preliminary assessments indicating a delay in significant output until repairs and a phased restart are completed.

Pre-incident production levels are not expected to resume until 2027.

Freeport anticipates a phased restart of unaffected sections by late 2025.

The Grasberg block cave is expected to begin a gradual ramp-up in early 2026, with full recovery targeted for 2027.

The company is anticipating a 35% decrease in 2026 production compared to previous estimates.

Furthermore, Freeport has notified commercial partners of the force majeure declaration under its contractual obligations.

The company plans to seek insurance recovery for damages, subject to policy limits and deductibles.

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 100888
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Le Cuivre

Message par energy_isere » 28 sept. 2025, 10:55

suite de ce post du 1er dec 2024: viewtopic.php?p=2403245#p2403245
Argentina approves McEwen’s $2.7B copper project for tax break program

Reuters | September 26, 2025

Argentina has approved Canadian miner McEwen Copper’s $2.7 billion Los Azules copper project in the country for a tax break program known as the Large Investment Incentive Regime (RIGI), the nation’s economy minister said on Friday.

The project is set to contribute $1.1 billion in exports a year, Economy Minister Luis Caputo said in a post on X. McEwen Copper is a subsidiary of McEwen Mining.

Argentina has not produced copper since its Alumbrera mine closed in 2018, but developers and analysts hope projects like Los Azules could make the South American nation a major global supplier.

Caputo said the approval marked a first for a copper mining proposal in San Juan province – Argentina’s leading gold mining region and a hub for so far non-operational copper projects – and would directly and indirectly create over 3,500 jobs.

Los Azules is the eighth project to be approved for the RIGI tax break scheme, bringing a total investment of $15.7 billion under the incentive plan promoted by the government of libertarian President Javier Milei.

Company sources told Reuters McEwen estimates the total investment for Los Azules, which towers 3,500 meters above sea level in the Andes mountain range, will reach $3 billion over three to four years.

The company must now seek financing for this investment, they said.

McEwen plans to produce copper cathodes in Argentina starting from 2029, and should soon publish a feasibility study showing operational details for the next 20 years while in the meantime it works to secure permits.

The mine is set to use a leaching copper extraction method rather than the traditional method of floating and skimming the concentrate, which the company expects will allow it to use five-sixths less water and reduce the impact on local residents.

McEwen is Los Azules’ main shareholder with a 46.4% stake, while automaker Stellantis holds another 18.3% and Nuton/Rio Tinto owns 17.2%.
https://www.mining.com/web/argentina-ap ... k-program/

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 100888
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Le Cuivre

Message par energy_isere » 28 sept. 2025, 11:04

suite de ce post du 13 avril 2025 : viewtopic.php?p=2409859#p2409859

Aurubus démarre l'usine de recyclage de cuivre dans l'état de Georgie.
Aurubis starts production at US copper recycling plant

Reuters | September 24, 2025

Image

Aurubis AG, Europe’s largest copper producer, said on Wednesday it had started production at its newly built US metal recycling plant at Richmond in Georgia.

The plant will reduce the need for US metal imports, with production expected to reach full capacity in the first half of 2026, Aurubis said.

With an investment of about $800 million, the plant will process up to 180,000 metric tons of complex waste recycling material annually, including printed circuit boards, copper cable and other metal-bearing products.

Production will include 70,000 tons of high-grade blister copper with purity of 98-99%, along with nickel, tin and precious metals.

“We intend to sell the copper primarily to US customers,” an Aurubis spokesperson said. “This will enable us to meet the growing demand for strategic metals such as copper in the US and elsewhere.”

The US currently has a copper demand of around 1.8 million tons per year, with around half imported. The Richmond plant will be a fast method to reduce imports, Aurubis said.

The blister copper produced by Aurubis Richmond can also be further processed into high-purity copper and copper products in Aurubis’ international smelting network in Europe.

Aurubis CEO Toralf Haag said the company may consider more projects in the United States.

“With the high availability of recycling material and good local conditions, the American market offers Aurubis appealing prospects that we will continue to consider closely in the future as well,” Haag said.
https://www.mining.com/web/aurubis-star ... ing-plant/

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 100888
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Le Cuivre

Message par energy_isere » 28 sept. 2025, 23:56

Prospect en Servie : Malka Golaja
Un nouveau gisement en Serbie affiche des ressources massives en cuivre et or

Par Enzo BECHER Article publié le : 25 septembre, 2025

Le sous-sol serbe vient de livrer un nouveau gisement prometteur dans la région de Timok, déjà connue pour sa richesse géologique. La société Zijin Mining a confirmé la découverte d'une cible nommée Malka Golaja, qui affiche des ressources significatives en cuivre et or, renforçant la position de la Serbie sur l’échiquier minier mondial.

Les premières analyses font état de 2,81 millions de tonnes de cuivre avec une teneur moyenne de 1,87 % et de 92 tonnes d’or à 0,61 g/t. Ce niveau de concentration est particulièrement attractif pour un gisement de cette envergure, même si l’or affiche une teneur modeste. La combinaison des deux métaux dans la même structure géologique renforce néanmoins l’intérêt économique du projet.

......................
https://www.bdor.fr/actualites-or/serbi ... de%20Timok.

Avatar de l’utilisateur
energy_isere
Modérateur
Modérateur
Messages : 100888
Inscription : 24 avr. 2005, 21:26
Localisation : Les JO de 68, c'était la
Contact :

Re: Le Cuivre

Message par energy_isere » 05 oct. 2025, 11:12

Copper price highest in over a year on Grasberg disruption, Fed outlook

Staff Writer | October 2, 2025

Copper prices climbed to their highest level in more than a year on Thursday, fueled by mounting global supply disruptions and growing expectations that US interest rate cuts will support demand for the industrial metal.


Benchmark futures on the London Metal Exchange (LME) briefly rose above $10,500 a tonne for the first time since May 2024, before trading at $10,497.50, up 1.1% as of 11:50 a.m. in London.

The rally has been bolstered by news that Freeport-McMoRan (NYSE: FCX) declared force majeure at its giant Grasberg mine in Indonesia. The setback adds to a series of supply challenges across South America and Africa, tightening global availability.

“The scale of this disruption is very big,” said Albert Mackenzie, copper analyst at Benchmark Mineral Intelligence.

Benchmark estimates that supply losses will reach 591,000 tonnes between September 2025 and the end of 2026, equivalent to about 2.6% of 2024’s global mine production, which analysts put at roughly 23 million tonnes.

The disruptions mean the copper market will swing into a deficit of around 400,000 tonnes in 2025, Benchmark said.

The impact has also led Goldman Sachs to revise its market balance forecast. The bank now projects a 55,500-tonne deficit for 2025, compared with its earlier expectation of a 105,000-tonne surplus. A small surplus is still expected in 2026.

Image
https://www.mining.com/copper-price-hit ... d-outlook/